RISK MANAGEMENT IN THE OPERATION OF A SPACE TECHNOLOGY TEST CENTRE - A CASE STUDY ON AITC MALAYSIA

机译:空间技术测试中心运营中的风险管理-以AITC Malaysia为例

获取原文

摘要

In every project, be it a construction project, a civil project or even in a typical procurement project, risks are unavoidable. Managing risks are crucial to ensure the success of a project, and it is the same for the AITC Malaysia. Risk management is defined as the identification, assessment and prioritization of risks and is extremely important and crucial in ensuring that the execution of the project will not create any negative impacts on the overall project cost, schedule and technical performance. The AITC Malaysia was designed and built by local consultants and contractors where else the installation of test equipment was done by the principals of each equipment. The involvement of various parties not only during installation and commissioning of the AITC, but also during operation of the AITC means risks is not only coming from internal parties, but also external. As the installation and commissioning about to come to an end and the operation of AITC will begin soon, it is imperative to identify risks associate with the operation of a test facility. This paper will review both internal and external risks sources that have been identified using risk charting method. Identified risks will then be assessed for their potential severity of impact and probability of occurrence using Composite Risk Index. Finally, this paper outlines the four strategies, which are risk avoidance, risk reduction, risk transfer and risk retention that will be used to treat the identified and assessed risks. The result of this paper will be presented to the top management of ANGKASA to be adopted.
机译:在每个项目中,无论是建筑项目,土建项目,甚至在典型的采购项目中,风险都是不可避免的。风险管理对于确保项目成功至关重要,而AITC Malaysia也是如此。风险管理被定义为风险的识别,评估和优先级排序,对于确保项目的执行不会对项目的总体成本,进度和技术性能产生任何负面影响,这是极为重要和至关重要的。马来西亚的AITC是由当地的顾问和承包商设计和建造的,而测试设备的安装则由每台设备的负责人负责。各方的参与不仅在AITC的安装和调试过程中,而且在AITC的运行过程中都意味着风险不仅来自内部各方,而且还来自外部。随着安装和调试即将结束,并且AITC的运行即将开始,必须确定与测试设施的运行相关的风险。本文将回顾使用风险图表法确定的内部和外部风险来源。然后,将使用综合风险指数评估已识别风险的潜在影响严重性和发生概率。最后,本文概述了四种策略,即规避风险,降低风险,转移风险和保留风险,将用于处理已识别和评估的风险。本文的结果将提交给要采用的ANGKASA高层管理人员。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号