首页> 外文会议>Annual Reliability and Maintainability Symposium >Software reliability estimations/projections, cumulative instantaneous
【24h】

Software reliability estimations/projections, cumulative instantaneous

机译:软件可靠性估算/投影,累积和瞬时

获取原文

摘要

Musa's methods (J.D. Musa et al., 1987) for software development and test planning combined with Duane's learning curve approach (E.O. Codier, 1968) for hardware reliability growth testing provide an efficient means for estimating and demonstrating reliability requirements. This paper reviews the analyses of Tractenberg (M. Trachtenberg, 1985) and Downs (T.Downs, 1985) that provide a foundation for Musa's basic (linear) model. I have used Musa's basic model in combination with an approach similar to that used by Duane and Codier for derivation of a formula for instantaneous failure rate for hardware to develop formulas for the estimation of instantaneous failure rate for software. These calculations show significant correlation with interval estimates and provide an efficient method for showing the achievement of goal reliability for software without a separate demonstration test.
机译:Musa的方法(J.D. Musa等,1987)用于软件开发和测试计划与Duane的学习曲线方法相结合(例如,Codier,1968),用于硬件可靠性增长测试提供了估算和展示可靠性要求的有效手段。本文审查了牵引贝尔格(M. Trachtenberg,1985)和下降(T.Downs,1985)的分析,为Musa的基本(Linear)模型提供了基础。我使用Musa的基本模型与Duane和Codier使用的方法相结合,用于推导用于瞬时故障率的公式,用于开发用于估计软件的瞬时故障率的公式。这些计算显示与间隔估计有显着的相关性,并提供了一种有效的方法,用于在没有单独的演示测试的情况下表明软件的目标可靠性的实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号