首页> 外文会议>Annual Hydrometallurgy Meeting >Concentrate leach plant startup, operation and optimization at the phelps Dodge Bagdad mine in Arizona
【24h】

Concentrate leach plant startup, operation and optimization at the phelps Dodge Bagdad mine in Arizona

机译:在亚利桑那州的菲尔普斯道奇·帕德达矿的集中浸出厂家启动,操作和优化

获取原文

摘要

In March 2003, Phelps Dodge started up an innovative pressure leach facility for processing copper concentrates at the Bagdad mine in Arizona. This paper describes the development of the concentrate leaching plant at Bagdad and the operational results from start up to present. Optimization efforts and an approach to mineralogical modeling of the concentrate to calculate oxygen utilization are also presented.
机译:2003年3月,菲尔普斯道奇启动了一个创新的压力Leach设施,用于在亚利桑那州巴格达矿的加工铜矿。本文介绍了Bagdad的浓缩浸出厂的开发,从启动到现在的操作结果。还介绍了优化努力和矿物学模型的矿物学建模,以计算氧利用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号