Port of Miami Project - Protecting Marine Species During Underwater Blasting

机译:迈阿密项目港口 - 保护海洋物种在水下爆破期间

获取原文

摘要

The Port of Miami, Miami-Dade County, Florida (Port) is the largest container port in the State of Florida. However, it is located in the center of a diverse ecosystem. Biscayne Bay surrounds the Port and portions of the bay have been designated as a National Park, a Florida Aquatic Preserve and a stale Critical Wildlife Area. The bay is home to many protected, threatened and endangered species including the Florida manatee, five sea turtle species, American crocodile and bottlenose dolphin, in addition to important recreational and commercial fish species. In 1990, Congress authorized the deepening and expansion of the Port including deepening of the Dodge Lummus Island Turning Basin and Fisherman's Channel to -42 feet. The Port previously attempted to complete the project without underwater blasting. The contractor and subsequent surety company were unable to successfully complete the authorized work primarily due to the limestone bedrock that was resistant to dredging. In 2000, the Port approached the Jacksonville District, U.S. Army Corps of Engineers (District) to complete this project. The District determined that blasting would be required as a construction technique and that Miami Harbor is occupied by a number of species that are protected under the Endangered Species Act (ESA) including the manatee, two species of sea turtles and the crocodile. As a result the District initiated consultation with the National Marine Fisheries Service (NMFS) and the U.S. Fish and Wildlife Service (USFWS) under Section 7 of the ESA. The District also determined that bottlenose dolphins, a species protected under the Marine Mammal Protection Act (MMPA), had been documented transiting through the Port and could also be affected by the proposed blasting. The District submitted an application for an Incidental Harassment Authorization under the MMPA in June 2002, which was issued in 2004 and renewed in April 2005. Construction blasting began in June 2005 and was completed in August 2005. A key determination made by NMFS and the USFWS was that protected marine species were unlikely to be seriously harmed by the detonations due to the District's conservative monitoring and mitigation measures aimed to ensure that protected marine species would not be within a pre-determined safety zone when the detonations occurred. This paper reviews the results from protected species watch program; an overview of acoustic and pressure measurement data collected during construction; and potential implications for future work using blasting as a construction technique in Florida or elsewhere.
机译:迈阿密港,迈阿密德德县,佛罗里达州(港口)是佛罗里达州最大的集装箱港口。然而,它位于各种生态系统的中心。 Biscayne海湾环绕着海湾的港口,部分湾被指定为国家公园,佛罗里达水生保留和陈旧的关键野生动物区。海湾是许多受保护,受威胁和濒危物种的家园,包括佛罗里达州海牛肉,五种海龟物种,美国鳄鱼和瓶装海豚,除了重要的娱乐和商业鱼类。 1990年,国会授权港口的深化和扩张,包括深化道奇露天岛转向盆地和渔民的频道到-42英尺。之前尝试完成项目的港口,而不会水下爆破。承包商和随后的保证公司无法成功完成授权工作,主要是由于石灰石基岩,耐疏浚。 2000年,该港口接近了杰克逊维尔区,美国工程师(区)的工程师(区),以完成这个项目。该地区确定爆炸作为施工技术,迈阿密港被占据了许多受濒危物种法案(ESA)保护的物种,包括海龟和鳄鱼的两种物种。结果,该区根据欧安全盟署第7条与国家海洋渔业服务(NMF)和美国鱼类和野生动物服务(USFWS)进行磋商。该区还确定了瓶颈海豚,在海洋哺乳动物保护法(MMPA)下保护的物种已被记录通过港口,也可能受到建议的爆破的影响。该区于2002年6月在2002年6月申请了2002年6月在2004年6月发布的偶然骚扰授权,并于2005年4月召开。建设爆炸于2005年6月开始,并于2005年8月完成。NMFS和USFW的主要决定由于该区的保守监测和减缓措施,旨在确保当爆炸发生时,旨在确保受保护的海洋物种不会在预先确定的安全区内不会在预先确定的安全区内的爆炸,导致的海洋物种不太可能受到爆炸的严重伤害。本文审查了受保护物种观看计划的结果;在施工期间收集的声学和压力测量数据的概述;在佛罗里达州或其他地方使用爆破作为未来工作的潜在影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号