RAG Coal West, Inc., Belle Ayr Mine is located in the heart of Wyoming's rich Powder River Basin coalfield. Belle Ayr utilizes an open pit, truck/shovel operation to strip the overburden off the 70'seam of sub bituminous coal. Our excavation capacities consist of a 301 Marion with a bucket size of 52 cubic yards, and a 4100 XPB P&H with a capacity of 76 cubic yards. Production levels on these machines are closely monitored utilizing the Modular Mining Dispatch system. RAG Coal West, Inc. is a coal mining business that utilizes the effectiveness of teams as one of their strategies. Technicians have a certain amount of control over their own Team Process. The Drilling & Blasting Team is an assortment of blasters with varying experience levels. We have been able to think outside of the box when it comes to certain "proven" methods of blasting. The arrival of Electronic Detonators at RAG Coal West, Inc. allowed the group to get "way out there" in terms of contradicting certain blasting rules of thumb. We now had the ability to do so many different things that were not available to us by use of the standard non electric shock tube delays. Without trying to change too many parameters at once, we identified the path that we wanted to follow in testing some of our theories. We had to overcome the additional cost of the electronic detonator by increasing the pattern size sufficiently to make it a "break even" blast. After some significant testing, it was apparent that the production output of the mine was not negatively impacted from the use of electronic detonators. When the electronic detonators and firing system was proven, we then began our testing process. We wanted to fire the blast-holes in a manner that allowed for more interaction of the initial shock wave. Our efforts were directed at increasing fragmentation by utilizing the collision of shock waves between holes. Delay between explosive charges had to be reduced significantly to create the desired effect. This non-conventional timing method has increased fragmentation, but it also resulted in increased back-break. It was observed however that this back-break was a positive by-product of this timing method. We witnessed up to a 31 percent increase in productive yield as a result of high speed blasting.
机译:Rag Coal West,Inc。,Belle Ayr Mine位于怀俄明州富含粉河流域煤田的中心地带。 Belle Ayr利用露天坑,卡车/铲子操作来剥去亚沥青煤的70角落中的覆盖层。我们的挖掘能力由301种MARION组成,桶尺寸为52立方码,4100 XPB P&H,容量为76立方码。利用模块化挖掘系统密切监测这些机器的生产水平。 RAG Coal West,Inc。是一种煤炭开采业务,可利用团队作为其策略之一的效力。技术人员对自己的团队进程有一定程度的控制权。钻孔和爆破团队是各种各样的爆破,体验水平不同。在某些“经过验证”的爆破方法方面,我们已经在盒子之外思考。电子戒断器在RAG Coal West,Inc。的到来允许该小组在违背某些爆破规则的拇指矛盾方面得到“出路”。我们现在有能力通过使用标准的非电击管延迟来做这么多不同的东西,这些东西无法使用。在不尝试立即更改太多参数的情况下,我们确定了我们在测试一些理论方面所需的路径。我们必须通过充分提高图案尺寸来克服电子雷管的额外成本,使其成为“甚至是”爆炸。经过一些重要的测试,显然矿山的生产产出与电子雷管的使用没有负面影响。当证明电子雷管和射击系统时,我们开始进行测试过程。我们希望以允许更初始冲击波的相互作用的方式发射爆炸孔。我们的努力通过利用孔之间的冲击波碰撞来提高碎片。爆炸性费用之间的延迟必须显着减少以产生所需的效果。这种非传统定时方法增加了碎片化,但它也导致退休增加。然而,观察到这一后断裂是该定时方法的正副产物。由于高速爆破,我们目睹了生产率产量增加31%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号