首页> 外文会议>Workshop on Geothermal Reservoir Engineering >Analysis of Non-Productive Time in Geothermal Drilling Operations-A Case Study of Olkaria, Kenya
【24h】

Analysis of Non-Productive Time in Geothermal Drilling Operations-A Case Study of Olkaria, Kenya

机译:地热钻探作战中非生产时间分析 - 以肯尼亚奥尔干岛为例

获取原文

摘要

Geothermal well drilling is one of the most expensive activities in a geothermal project. Daily operational costs, such as the daily rig rate, make up a big part of drilling costs. The longer it takes to drill a well, the more expensive the well becomes. It is therefore important to optimize the time spent in drilling so as to optimize the cost of a well. To achieve this, an analysis of the non-productive time incurred while drilling a well is necessary so as to identify areas of improvement. This paper gives a review of the non-productive time incurred while drilling geothermal wells in the Olkaria field in Kenya with the view of improving the process and hence saving on costs.
机译:地热钻井是地热项目中最昂贵的活动之一。每日运营成本,如日常钻机率,弥补了钻井成本的大部分。钻井井所需的时间越长,井变得越高。因此,优化在钻井中花费的时间非常重要,以优化井的成本。为实现这一目标,需要分析钻井时产生的非生产时间,以确定改进领域。本文介绍了在肯尼亚的奥尔卡里亚领域钻井地热井时产生的非生产时间,以改善该过程,从而节省成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号