首页> 外文会议>Workshop on Geothermal Reservoir Engineering >ENVIRONMENTAL IMPACT ASSESSMENT OF SABALAN GEOTHERMAL POWER PLANT, NW IRAN
【24h】

ENVIRONMENTAL IMPACT ASSESSMENT OF SABALAN GEOTHERMAL POWER PLANT, NW IRAN

机译:萨巴兰地热电厂,NW伊朗环境影响评价

获取原文

摘要

Environmental Impact Assessment (EIA) of Sabalan geothermal power plant project in the northwestern part of Iran using Rapid Impact Assessment Matrix (RIMA) method is presented. The Sabalan geothermal power plant is planned to produce 50 MW electricity in 2011 in cooperation of the Ministry of Energy (MOE) and Renewable Energy Organization of Iran (SUNA). In this study, an attempt was made to identify and assess the likely key impacts of geothermal exploration, drilling and operation. Then on the basis of current evaluation suggest monitoring program and mitigation plans. Present state information on the regions environment including physical, biological and social environment was collected during 2000-2003, before starting the proposed project activities. In the evaluation process, positive and negative environmental impacts of Sabalan geothermal power plant were assessed based on the results of multi-disciplinary team approach and the field survey data using RIMA method. The results of assessment reveal that the 57percent of the impacts are positive and 43percent are negative, therefore the implementation of the project with some mitigation plans and monitoring program is accepted.
机译:介绍了使用快速影响评估矩阵(RIMA)方法的伊朗西北部萨巴拉汉地热电厂项目的环境影响评估(EIA)。西巴兰地热发电厂于2011年在能源(Moe)和可再生能源组织(Suna)的合作中生产50兆瓦的电力。在这项研究中,试图识别和评估地热勘探,钻井和操作的可能关键影响。然后在当前评估的基础上建议监测计划和缓解计划。在开始拟议的项目活动之前,在2000 - 2003年期间收集了关于包括物理,生物和社会环境的地区环境的国家信息。在评估过程中,基于多学科团队方法的结果和使用RIMA方法的现场调查数据来评估Sabalan地热发电厂的正面和负面环境影响。评估结果表明,撞击的57%是积极的,43%是消极的,因此接受了与一些缓解计划和监测计划的项目的实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号