首页> 外文会议>IASTED International Conference on Software Engineering >REASSESSING BROOKS' LAW THROUGH CONSIDERATION OF MANPOWER ABILITIES
【24h】

REASSESSING BROOKS' LAW THROUGH CONSIDERATION OF MANPOWER ABILITIES

机译:通过考虑人力能力重新评估布鲁克斯的法律

获取原文

摘要

When software projects falls behind schedule, managers make any possible reactions to avoid any schedule slippage, mostly by adding new people to their projects. Adding more people to a late software project may cause negative impacts on the progress of the project as the result of assimilation time, training overhead and communication overhead. Consequently, a project manager faces difficulties to make the decision whether to add new members to his team or not. Therefore, in this research we attempted to address the problem by understanding how software project managers can minimize the negative impacts of adding new people to delayed software projects. This research aims to explore the effects of adding manpower to a late software project through personnel factors trade-off analysis. Particularly, this study has the intention to examine whether a significant schedule improvement can be achieved with proper consideration of the new manpower capabilities, skills and experience. For fulfillment of this research, we built a system dynamics model to simulate the dynamic behavior of the project progress when new members added with different ranges of personnel capabilities. In addition, an example case study has been run and related simulation results are compared with previous models. The result of this study shows that significant schedule improvement of a late project can be achieved if people with certain level of capabilities are added to a project.
机译:当软件项目落后于计划后,管理人员会避免任何可能的反应,以避免任何时间表滑动,主要是通过将新人添加到他们的项目中。将更多人添加到后期软件项目可能会对项目的进度产生负面影响,因为同化时间,培训开销和通信开销。因此,项目经理面临困难,以决定是否为他的团队添加新成员。因此,在本研究中,我们试图通过了解软件项目经理如何最大限度地减少将新人添加到延迟软件项目的负面影响来解决问题。本研究旨在通过人员因素进行权衡分析来探讨将人力添加到后期软件项目的影响。特别是,本研究有意审查可以通过适当考虑新的人力能力,技能和经验来实现重大进度改进。为了满足本研究,我们建立了一个系统动态模型,以模拟项目进展的动态行为,当新成员添加不同的人员能力范围时。此外,已经运行了示例性案例研究,并将相关的仿真结果与先前的模型进行了比较。本研究结果表明,如果具有一定程度的能力水平的人被添加到项目中,可以实现延迟项目的重大进度改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号