【24h】

Mt Arthur North Coal Project

机译:MT亚瑟北煤项目

获取原文

摘要

Roberts & Schaefer Australia Pty Ltd formed a joint venture with Sinclair Knight Mere in June 2001, to provide EPCM services (engineering, procurement, and construction management) for the new 15 million tonnes per annum Mt. Arthur North Coal Project of Hunter Valley Energy Coal (BHPBilliton). The new facilities are located north of Sydney near Muswellbrook, NSW, Australia and are designed to provide both domestic and export quality thermal coals. Domestic coal was delivered on schedule to the local power station in late December 2002 and the coal preparation plant (CPP) was commissioned in the 3rd quarter of 2003, the 100th anniversary of Roberts & Schaefer.
机译:Roberts&Schaefer Australia Pty Ltd于2001年6月组建了一家合资企业,为斯诺克莱斯骑士,为每年新的1500万吨,为新的1500万吨提供EPCM服务(工程,采购和建筑管理)。猎人谷煤矿煤炭(Bhpbilliton)。新设施位于澳大利亚南威尔士州穆斯威尔布鲁克(Muswellbor)的悉尼北部,旨在提供国内和出口质量的热煤。国内煤炭于2002年12月下旬向当地发电站送达当地发电站,煤炭准备厂(CPP)于2003年第3季度委托,罗伯茨&Schaefer 100周年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号