首页> 外文会议>Annual International Coal Preparation Exhibition Conference >The Design, Construction, and Commissioning of the New 2100 TPH Arch Coal Cardinal Preparation Plant
【24h】

The Design, Construction, and Commissioning of the New 2100 TPH Arch Coal Cardinal Preparation Plant

机译:新型2100 TPH拱煤基型制备厂的设计,施工和调试

获取原文

摘要

Arch Coal leases a major block of high quality bituminous coal predominantly in the Alma and Lower Cedar Grove Seams in the vicinity of the town of Sharpies in Logan County, West Virginia. The property is called Mountain Laurel. No existing mine or processing facilities were present at this site in 2003. A detailed feasibility study during 2003 indicated that the coal could be mined, processed and sold providing an adequate rate of return to justify the anticipated capital outlay. (+ 250 million U.S. dollars).
机译:拱煤在西弗吉尼亚州洛根县的山峰附近,主要在Alma和下雪松树丛接缝中主要是高质量的沥青煤层。该物业称为山月桂树。本网站于2003年出现了现有的矿山或加工设施。2003年的详细可行性研究表明,煤炭可以采取,加工和销售,提供足够的回报率,以证明预期的资本支出。 (+ 2.5亿美元)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号