首页> 外文会议>Annual International Pittsburgh Coal Conference >Upgraded Brown Coal (UBC) Mine Mouth Power Plant in Indonesia/Environmentally Friendly Low CO2 Emission Lignite Based Power Plant
【24h】

Upgraded Brown Coal (UBC) Mine Mouth Power Plant in Indonesia/Environmentally Friendly Low CO2 Emission Lignite Based Power Plant

机译:升级的棕色煤(UBC)矿井口发电厂在印度尼西亚/环保低二氧化碳排放褐煤电厂

获取原文

摘要

Indonesia is now facing serious electric shortage and same situation in Sumatra. The serious power shortage in South Sumatra and Jambi is forecast in 2008 if no additional new power plants excluding Musi hydro power (210MW, after 2004) and Tarahant thermal power (200MW, after 2005) are installed. Among the energy resources, coal deposit is considered as the one which is expected to solve the energy problem especially in terms of electricity, since it is widely distributed and therefore offers the potential for stable supplies and a relatively stable and low price in energy resources. At present, coal resources in Indonesia are estimated to reach 38 billion tons, of which around 54 percent are lignite and South Sumatra has largest lignite deposit in Indonesia.
机译:印度尼西亚目前正在面临严重的电力短缺和苏门答腊的情况。 2008年预测了南苏立特拉和吉姆海的严重缺点,如果没有额外的新电厂,不包括斯米水电站(210MW,2004年以后)和Tarahant热力(200mW之后,2005年后)安装。在能源资源中,煤矿矿床被认为是预期在电力方面解决能源问题的人,因为它被广泛分布,因此提供了稳定的用品和能源相对稳定和低价格的潜力。目前,印度尼西亚的煤炭资源估计达到380亿吨,其中距离褐煤和南苏门答腊约有54%的吨,印度尼西亚最大的褐煤矿床。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号