A necessity to reclaim lands damaged as a result of mining of brown coal using open pit or strip method, as well as a need to deposit the furnace wastes created as a result of combustion of this coal in Patnow Power Station resulted in a need to take steps towards complete solution of this problem. The hitherto existing fly and bottom ash deposit yard is nearly full, whereas the applicable transport and depositing technology using hydraulic method with large amounts of water does not comply with the present standards of environment protection.
机译:通过使用露天坑或剥离法在棕煤挖掘出来的地造成土地的必要性,并且需要在帕特诺发电站燃烧这种煤炭的燃烧所产生的炉废物导致需要采取解决这个问题的完整解决方案的步骤。迄今为止现有的苍蝇和底灰沉积码几乎满是,而使用大量水的适用运输和存款技术不符合目前的环境保护标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号