首页> 外文会议>International Symposium on Mine Planning and Equipment Selection >Pre-cut operation in the Nochten opencast mine - efficient overburden removal and winning on the basis of innovative equipment and use of suitable geological and technological models
【24h】

Pre-cut operation in the Nochten opencast mine - efficient overburden removal and winning on the basis of innovative equipment and use of suitable geological and technological models

机译:在Nochten Opencast矿山矿床中的预削换操作 - 基于创新设备和使用合适的地质和技术模型的基础上的高效覆盖

获取原文

摘要

The influence of the deregulation of the German energy market lead to an enormous increase in the cost pressure on all parts of the value chain in the energy company. A new technological and plant-technical concept was developed for the Nochten opencast mine, an operation of the company Vattenfall Europe Mining AG that is effective in the long ran. This concept secures an essential reduction of the investment for the required plant equipment and contributes at the same time to considerably lower the operating costs. The challenge was to co-ordinate the interests between an undisturbed production of two different excavators feeding one belt conveyor on the one hand, and an uncompromising fulfilment of the recultivation goals under difficult geological conditions on the other hand. The requirement is met by a new planning and operational management system that is described in detail in the following report. It refers to the realisation of a quality management and control system for overburden handling.
机译:德国能源市场放松管制的影响导致能源公司价值链各地的成本压力巨大增加。为Nochten Opencast Mine开发了一种新的技术和工厂技术概念,该公司的Vattenfall欧洲矿业股份有限公司在长期跑步方面是有效的。这一概念确保了所需工厂设备的投资的基本降低,并同时贡献,相当降低运营成本。挑战是在一方面统筹不受干扰的两种不同挖掘机生产之间的兴趣,另一方面,在困难的地质条件下,不妥协履行重新发生的目标。该要求由新的规划和操作管理系统满足,该系统在以下报告中详细描述。它是指实现覆盖物处理的质量管理和控制系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号