首页> 外文会议>World conference on earthquake engineering >IMPROVED DISPLACEMENT MODIFICATION FACTOR TO ESTIMATE MAXIMUM DEFORMATIONS OF SHORT PERIOD STRUCTURES
【24h】

IMPROVED DISPLACEMENT MODIFICATION FACTOR TO ESTIMATE MAXIMUM DEFORMATIONS OF SHORT PERIOD STRUCTURES

机译:改进的位移修改因子来估计短时间结构的最大变形

获取原文
获取外文期刊封面目录资料

摘要

An improved procedure to estimate maximum inelastic deformation demands of short period structural systems is investigated. The procedure makes use of inelastic displacement ratios that permit the estimate of the maximum inelastic deformation from the maximum elastic deformation. It is shown that the ratio of peak inelastic to peak elastic displacement is strongly correlated to the ratio of peak ground velocity and peak spectral velocity for structures with short periods of vibration. This interesting observation is then used to propose a simplified displacement modification factor that is a function of the period of the system, its lateral strength and the ratio of spectral velocity to peak ground velocity. A large set of earthquake ground motions recorded on sites having average shear wave velocities larger than 180 m/s are used to compute the error statistics on the inelastic deformation estimations of this new equation. It is shown that the new procedure leads to significant reductions in the variability of the results, and hence provides a more reliable tool for estimating inelastic deformation demands to be used in displacementbased procedures.
机译:研究了估计短时间结构系统的最大非弹性变形需求的改进程序。该程序利用非弹性位移比,允许估计来自最大弹性变形的最大非弹性变形。结果表明,峰值的峰值弹性位移的比率与具有短振动时段的结构的峰值接地速度和峰值光谱速度的比率强烈地相关。然后使用这种有趣的观察来提出一种简化的位移修改因子,该分离改性因子是系统时段的函数,其横向强度和峰值地面速度的光谱速度的比率。在具有大于180 m / s的平均剪切波速度的位点上录制的大量地震地面运动用于计算该新方程的无弹性变形估计的误差统计。结果表明,新程序导致结果的可变性显着降低,因此提供了一种更可靠的工具,用于估计在位移基础的程序中使用的无间质变形要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号