首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >Successful Application of Extended Reach Drilling (ERD) Technology in Super Giant Onshore Middle East Field, Case Study
【24h】

Successful Application of Extended Reach Drilling (ERD) Technology in Super Giant Onshore Middle East Field, Case Study

机译:超大陆上陆上中东地区扩展钻井(ERD)技术的成功应用,案例研究

获取原文

摘要

Extended reach drilling (ERD) represents one of the industry’s most impressive engineering accomplishments in terms of wellbore construction. As the recovery of oil and gas becomes more complex, these wells have pushed drilling engineering boundaries to new limits to meet the world’s demands in the safest, most environmentally conscious and cost effective manner. Drilling ERD wells requires the latest innovations in drilling engineering principles; such wells are more interrelated and sensitive to smaller changes than conventional wells. An integrated approach for both planning and execution becomes more critical due to the high operational risks and all uncertainties must be properly assessed by solid engineering planning. In addition to that, it brings engineering challenges from many disciplines, which must be met and addressed for proper execution. Integration of drilling and real time evaluation allows engineers and geoscientists to take the proper drilling decisions and lead to reduce operational risk. It will also provide an accurate well placement; improve drilling efficiency and maximum recovery. Well-1 & Well-2 were the latest ERD wells drilled in Abu Dhabi. Abu Dhabi Company for Onshore Oil Operations (ADCO) has drawn on extensive experience from numerous ERD Projects around the world, successful engineering tools and proper assessment for the several of challenges of those projects. In addition to the positive contribution from National Drilling Company (NDC) in providing all the necessities in terms of equipment and support which enabled the land rig to drill the well Well-1 to a total depth of 19,725 ft MD with a horizontal displacement (HD) of 10,131 ft. In addition, Well-2 was drilled to a total depth of 20,003 ft MD with a horizontal displacement of 10,303 ft, which was a bench mark record in the United Arab Emirates (UAE). The numerous challenges faced on those two wells in terms of planning and the rich experience gained from successfully executing such wells are all highlighted in the attached paper.
机译:延长到达钻井(ERD)代表了在井筒建设方面的行业最令人印象深刻的工程成就之一。随着石油和天然气的回收变得更加复杂,这些井已经推动了钻井工程边界,以满足世界上最安全,最环保和成本效益的方式的世界需求。钻井ERD Wells需要钻探工程原则的最新创新;这种井比传统孔更相互关联和敏感到较小的变化。由于高运营风险,规划和执行的综合方法变得更加重要,并且必须通过实际工程规划适当地评估所有不确定性。除此之外,它还从许多学科带来工程挑战,必须满足并解决适当的执行。钻井和实时评估的整合允许工程师和地质学家采取适当的钻井决策并导致降低操作风险。它还将提供准确的井位置;提高钻井效率和最大恢复。 Hont-1和Hont-2是Abu Dhabi钻了最新的ERD Wells。阿布扎比公司为陆上石油业务(ADCO)已经从世界各地的众多ERD项目,成功的工程工具和对这些项目的几个挑战进行了适当的评估的丰富经验。除了国家钻探公司(NDC)在提供所有必需品方面提供所有必需品,这使得土地钻机钻井井-1至19,725英尺的总深度,水平位移(HD )10,131英尺。此外,HOLL-2钻到总深度为20,003英尺的MD,水平位移为10,303英尺,是阿拉伯联合酋长国(阿联酋)的长凳记录。在规划方面面临的许多挑战以及成功执行这种井中获得的丰富经验均突出显示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号