首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >Successful Deployment of new Extended RockstrongTM Coring System: Record Coring Delivery and Recovery Achievement in ADCO Exploration well–UAE case History
【24h】

Successful Deployment of new Extended RockstrongTM Coring System: Record Coring Delivery and Recovery Achievement in ADCO Exploration well–UAE case History

机译:成功部署新的扩展RockstrongTM取芯系统:在ADCO勘探井 - 阿联酋案例中记录取芯交付和恢复成就

获取原文

摘要

This paper presents how extensive pre-job planning and proper utilization of new technology led to actualizing the coring objective of a well safely including successful coring through the hydrogen sulphide (H2S)rich Habshan 1 and 2 formations in an onshore field of the Abu Dhabi Company For Onshore Oil Operations(ADCO)in the United Arab Emirates. Well AK1 is part of a wider field appraisal plan to be used for data gathering and building a conceptual field development plan.The challenges were multiple,not only from the planning and coring bottom hole assembly(BHA)design point of view,but also in terms of effective health,safety and environment management during execution posing environmental and technical challenges to the desired data gathering objective. The appraisal well AK1 well design required 12 conventional coring BHA runs over a 27days duration including coring with an 8–1/2”coring BHA through a 12–1/4 hole section.With detailed forward planning,use of new extended coring technology,operational focus and health,safety&environment (HSE)consciousness at the forefront,6 continuous cores in 15 rig days with a record total core length in excess of 1,300 ft was successfully cut with 100%recovery factor through Shilaif,Mauddud,Top Nahr Umr,Unit 22a,Unit 22,Habshan,Habshan 1,Habshan 2 and Dense below Habshan 2 formations with H2S contents way in excess of safe limits saving 12 days rig time and almost$1m USD of planned well cost in the process. This paper aims to share how this was recently achieved highlighting some of the challenges faced in terms of planning and sharing the experience gained from successful execution of well AK1,including coring through H2S bearing formations,with respect to optimized core acquisition and handling for the benefit of other operators in the region.
机译:本文介绍了新技术的广泛采用预先训练和适当利用,导致良好安全的核心目标,包括通过硫化氢(H2S)丰富的Habshan 1和2个地层在Abu Dhabi公司的陆地领域成功核心对于阿拉伯联合酋长国的陆上石油业务(ADCO)。 AK1是更广泛的现场评估计划的一部分,用于用于数据收集和构建概念性领域的发展计划。挑战是多个,不仅来自规划和上衣底部孔组件(BHA)设计的观点,还有在执行期间对所需数据收集目标的环境和技术挑战构成环境和技术挑战的有效健康,安全和环境管理条款。评估井AK1井设计需要12个常规的CORIC BHA在27天的持续时间内运行,包括通过12-1 / 4孔部分的8-1 / 2“取芯BHA。详细的正向规划,使用新的扩展精芯技术,在Forefront的操作重点和健康,安全环境(HSE)意识,6个连续核心在15个钻机日内,记录总核心长度超过1,300英尺的核心长度,通过Shilaif,Mauddud,Top Nahr UMR,单位成功地切割了100%回收因子。 22A,单元22,Habshan,Habshan 1,Habshan 2和Habshan 2的密集,具有H2S内容的地层,超出了安全限制的安全限制,节省了12天的钻机时间,近100万美元在该过程中规划的井成本。本文旨在分享最近突出的一些挑战,突出了规划和分享了从井AK1的成功执行中获得的经验,包括通过H2S轴承结构,关于优化的核心收购和处理福利的核心该地区的其他运营商。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号