首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >Evolution of Cementing and Stimulation Techniques for Horizontal Wells Drilled In Unconventional Shale Formations
【24h】

Evolution of Cementing and Stimulation Techniques for Horizontal Wells Drilled In Unconventional Shale Formations

机译:非传统页岩形成钻井水泥井的水泥和刺激技术的演变

获取原文

摘要

Drilling and completion of unconventional shale formation is one of the fastest growing technologies in tight shale formation.The number of wells drilled in search of gas in shale is increasing rapidly since the beginning of 2000.Cementing these wells poses several challenges.The productive zone throughout the play has been developed using a combination of vertical and horizontal wells.Production from the reservoirs has been optimized by using various completion and stimulation techniques.Currently in an effort to reduce environmental impact,increase the net present value,and maximize reservoir pressure and contact into the thin sweet spots,horizontal wells have gained popularity in these shale formations.The performance of these reservoirs depends upon the completion and stimulation methods used because the matrix permeability is too low for commercial production of gas.The wellbore area must be increased in order to reach the immobile hydrocarbons.The techniques and materials used for fracturing these wells and enhance the effective wellbore drainage radius are numerous. Previous experience from these formations showed some enhancement for vertical wells completed with hydraulic fracturing.The early stimulation techniques were primarily nitrogen-foam fracture treat- ments which yielded economic rates necessary for further filed development of these formations.Better enhancement is expected from the same formations if horizontal wells are drilled coupled with multistage hydraulic fracturing.This enhancement can further be improved by stimulating with slick water and cross-linked gels.This paper will discuss the challenges during cementing and stimulation of horizontal well.Finally,materials that are most economically viable in these formations will be enumerated.
机译:钻井和完成非传统页岩形成是紧缩页岩形成中最快的技术之一。自2000年初以来,在页岩中寻找气体的井中的数量正在迅速增加。这些井造成了几个挑战。整个井中的生产区使用垂直和水平井的组合开发了该游戏。通过使用各种完井和刺激技术进行了优化了储存器的生产。全部努力减少环境影响,增加净现值,并最大限度地提高水库压力和接触进入薄甜点,水平井在这些页岩形成中越来越受欢迎。这些储层的性能取决于所用的完成和刺激方法,因为基质渗透率太低而不能用于商业生产气体。必须按顺序增加井筒区域到达Immobile烃。使用的技术和材料R压裂这些井并增强有效的井筒排水半径很多。这些地层以前的经验表明,采用液压压裂完成的垂直井一定的增强。早期刺激技术主要是氮泡沫骨折处理,从而产生了进一步提交这些地层的经济率。预计来自同一地层的增强预期如果钻井井与多级液压压裂相连。通过用光滑的水和交联凝胶刺激,可以进一步提高增强。本文将讨论水泥期间的挑战和水平井的刺激。最后,最经济上最具经济可行的材料在这些地层中将列举。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号