首页> 外文会议>IWA International Specialised Conference on Large Wastewater Treatment Plants >Improvement of nitrogen removal at WWTP Zuerich Werdhoeelzli after connection of WWTP Zuerich-Glatt
【24h】

Improvement of nitrogen removal at WWTP Zuerich Werdhoeelzli after connection of WWTP Zuerich-Glatt

机译:WWTP Zuerich-Glatt后改善WWTP Zuerich Werdhoeelzli的氮气去除

获取原文

摘要

Optimisation of nitrifying activated sludge plants towards nutrient removal (denitrification and enhanced P-removal) leads to a substantial reduction of operating costs and improves effluent and operating conditions. At WWTP Zuerich-Werdhoeelzli, initially designed for nitrification only, an anoxic zone of 28% of total activated sludge volume was installed and allowed 60% nitrogen elimination besides several other optimisations. In 2001 the operation of WWTP Zuerich-Glatt was stopped and the wastewater was connected to WWTP Werdhoelzli. To improve nitrogen removal, WWTP Werdhoelzli co-financed two research projects; one for separate digester supernatant treatment with the anammox process operating two SBRs in series and the other applying NH_4 sensors for aeration control in order to decrease energy consumption and raise effluent quality. The results of both projects and the consequences for WWTP Werdhoelzli are discussed in this paper.
机译:优化硝化活化污泥植物营养去除(脱硝化和增强的P-去除)导致运营成本的大幅降低,改善了流出物和操作条件。在WWTP Zuerich-Werdhoeelzli上仅设计了硝化,安装了28%的总活性污泥体积的缺氧区,除了几种其他优化之外,允许60%的氮消除。 2001年,停止了WWTP Zuerich-Glatt的操作,废水连接到WWTP WERDHOELZLI。改善氮气去除,WWTP Werdhoelzli共同资助两项研究项目;一种用于单独的蒸煮器上清液处理,厌氧过程用串联操作两个SBRS,另一个应用NH_4传感器进行曝气控制,以降低能量消耗并提高流出质量。本文讨论了项目的结果和WWTP WERDHOELZLI的后果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号