Key technical problems of the Three Gorges Project construction

机译:三峡工程建设重点技术问题

获取原文

摘要

The Three Gorges Project (TGP) has huge work load, amounts to about 2.8 X 10~7 m~3 concrete, 1.04 X 10~8 m~3 earth-rock excavation and 7.2 X 10~5t metal structures and reinforcing steel bars. TGP is constructed in three stages, 5 years preparative and the first stage, 6 years the second stage and 6 years the third stage. Main river closure of the second stage and diversion channel closure of the third stage were orderly actualized. In the second stage, from 1998 to 2003, poured 1.846 X 10~7 m~3 concrete and installed 1.92 X 10~5 t metal structures and embedded elements of mechanical and electrical equipments. The new world's record of 5.4285 X 10~6 m~3 concrete-placing in one year was created in 2000.
机译:三峡工程(TGP)有巨大的工作负荷,金额为约2.8 x 10〜7 m〜3混凝土,1.04 x 10〜8 m〜3岩石挖掘和7.2 x 10〜5t金属结构和加强钢筋。 TGP是三个阶段,5年制备和第一阶段,6年第二阶段和6年第三阶段。第三阶段的第二阶段和转移渠道关闭的主要河流闭合有序实现。在第二阶段,从1998年到2003年,倒入1.846 x 10〜7 m〜3混凝土,安装了1.92 x 10〜5 t金属结构和嵌入式机电设备。新世界的纪录为5.4285 x 10〜6 m〜3的混凝土放置在一年内,于2000年创建。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号