首页> 外文会议>International Conference on Dam Engineering >Dynamic design for high slope treatment for left bank underground power house intake of Longtan hydroelectric project
【24h】

Dynamic design for high slope treatment for left bank underground power house intake of Longtan hydroelectric project

机译:龙潭水电项目左岸地下电力屋摄入量高坡度处理动态设计

获取原文

摘要

The high slope treatment for left bank underground powerhouse intake of Longtan hydroelectric project is one of the important technical issues for the project construction. The excavation and strengthening scheme was determined after pre-exploration, lots of scientific experiments and stability study having been carried out. Furthermore, emphasis was placed on strengthening dynamic design and control for the project in the period of the construction. This paper gives a brief introduction for the slope geological conditions, outline of the design general situation, dynamic design concept and procedures and the dynamic design and control for the project in the construction practice.
机译:龙潭水电项目左岸地下电力厂的高坡度处理是项目建设的重要技术问题之一。挖掘和加强方案是在勘探前进行确定的,进行了许多科学实验和稳定性研究。此外,在建设期间强调强化项目的动态设计和控制。本文简要介绍了坡地地质条件,设计一般情况概述,动态设计理念和程序以及施工实践中项目的动态设计和控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号