IC DETAIL BEYOND DESIGN CERTIFICATION REQUIRED FOR ISSUE OF A COMBINED OPERATING LICENSE

机译:除了合并的运营许可证所需的设计认证之外,I&C详细信息

获取原文

摘要

The purpose of this paper is to provide an overview of the approach and guidelines needed to allow and applicant to receive a Combined Operating License (COL) under 10 CFR Part 52, from the U.S. Nuclear Regulatory Commission. This area of focus is considered a critical path requirement to implement the specific review of the design that was built to conform with the Design Acceptance Criteria (DAC), issued as part of a Design Certification (DC). NPP designers and vendors submit designs of advanced standardized NPPs to the NRC for review and approval under 10 CFR Part 52, Early Site Permits: Standard Design Certifications and Combined Licenses for Nuclear Power Plants. To obtain a standard design certification under Part 52, applicants submit a standard safety analysis report (SSAR) which should include information on the instrumentation and control (I&C) and Human Factors Engineering (HFE) program. However, since technology is continually advancing, and there may be significant time elapsed between the application for a DC and for a later plant specific COL, details of the applicant's I&C and HFE design may not be complete before a design certification is issued by the NRC. In such cases, reviews under 10 CFR Part 52 would primarily focus on the design criteria and design process. The extent of design documentation and technology receiving prior review by NRC at the design certification stage has varied among different NPP designs. Applicants seeking to operate a standardized NPP under 10 CFR Part 52 who already have received a design certification, are required to document those portions of the design, not previously revised, as part of the COL. Thus, for advanced NPPs, reviews using the requirements identified here for I&C and HFE reviews, can occur at different points within the 10 CFR Part 52 application and licensing process.
机译:本文的目的是概述允许和申请人从美国核监管委员会收到10 CFR第52款下的合并运营许可(COL)所需的方法和准则。该焦点领域被认为是实现了根据设计认证(DC)的一部分发布的设计符合设计验收标准(DAC)的设计的特定审查的关键路径要求。 NPP设计师和供应商向NRC提交先进标准化NPP的设计,以便在10 CFR第52部分下进行审查和批准,早盘允许:标准设计认证和核电站的合并许可证。为了在第52部分下获得标准设计认证,申请人提交了标准的安全分析报告(SSAR),该报告应包括有关仪器和控制(I&C)和人类因素工程(HFE)计划的信息。然而,由于技术不断推进,并且在DC的应用与后来的工厂特定的COL之间可能存在很大的时间,因此在NRC颁发设计认证之前,申请人的I&C和HFE设计的细节可能无法完成。在这种情况下,10岁CFR第52部分下的评论主要集中在设计标准和设计过程中。 NRC在设计认证阶段之前审查的设计文档和技术的程度在不同的NPP设计中变化。要求在已经收到设计认证的10 CFR部分52下寻求经营标准化NPP的申请人,以记录设计的那些部分,以前未经修改,作为Col的一部分。因此,对于高级NPPS,使用此处为I&C和HFE评论的要求的评论,可以在10 CFR部分52应用程序和许可流程中发生在不同的点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号