首页> 外文会议>ICFA Advanced Beam Dynamics Workshop on Beam Halo Dynamics, Diagnostics, and Collimation >Handling High Activity Components on the SNS (Collimators and Linac Passive Dump Window)
【24h】

Handling High Activity Components on the SNS (Collimators and Linac Passive Dump Window)

机译:处理SNS上的高活动组件(准直器和Linac被动转储窗口)

获取原文

摘要

The Spallation Neutron Source accelerator will provide a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron production. The expected highest doses to components are in the collimation regions. This paper presents the mechanical engineering design of a typical collimator highlighting the features incorporated to assist with collimator removal once it is activated. These features include modular shielding, integrated crane mounting, remote water fittings and vacuum clamps. Also presented is the design work in progress at present to validate the remote vacuum clamp design. This includes a test rig that mimics an active handling scenario where vacuum bellows can be compressed and clamps removed/replaced from a safe distance.
机译:介绍中子源加速器将提供1 GEV,1.44 MW质子束到中子生产的液体汞靶标。对组件的预期最高剂量在准直区域中。本文介绍了典型准直器的机械工程设计,突出了掺入的功能,一旦激活,就能辅助准直器去除。这些功能包括模块化屏蔽,集成的起重机安装,遥控器配件和真空夹具。还提出了设计工作,验证了远程真空钳位设计。这包括试验台,用于模拟有效处理场景,其中真空波纹管可以被压缩,并且从安全距离中移除/夹具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号