A deep-water capping demonstration project was conducted at the 90-m deep Massachusetts Bay Disposal Site (MBDS). Although capping has been successful at shallower-water sites (<65 m depth), it previously had not been proven effective at deeper sites. In order to accomplish the goals of the capping demonstration without actually using sediment with unacceptable contaminant levels, sediment deemed suitable for unconfined open water disposal from Cohasset Harbor, Cohasset, Massachusetts was used to represent the sediment needing capping. Sediment representing the cap originated from the deepening dredging project in Chelsea River as part of the Boston Harbor Navigation Improvement Project (BHNIP). Cohasset Harbor and Chelsea River sediments were visually and physically distinct. A series of monitoring surveys was completed over the Cohasset Harbor Capping Project (CHCP) mound during the different phases of capped mound formation, including a baseline survey, a pre-cap survey and a post-cap survey. The capped mound was developed in 86 m of water over a 0.64 km~2 area of featureless seafloor located near the southern boundary of MBDS, away from the active region of the disposal site. From December 1998 through February 1999 a total estimated barge volume of 41,250 m~3 of sandy silt and gravel from Cohasset Harbor was deposited, creating a mound 0.4 m high, with a detectable footprint approximately 600 m wide. The mound was capped in spring 2000 with 170,000 m~3 of sediment, primarily from Chelsea River. A post-cap survey indicated that the majority of cap had accumulated within a 100 m radius of the CHCP disposal buoy. However, the cap apron was over 800 m wide, somewhat irregular in shape, and covered all but a small area of the Cohasset Harbor sediment. The results of the single beam bathymetry, side-scan sonar, sediment-profile imaging, and sediment sampling (surface grabs and cores) surveys used to document the development of the CHCP mound agreed well throughout the demonstration project. These data indicate that a layered deposit consisting of distinct sediment strata was developed on the MBDS seafloor.
机译:深水封顶示范项目是在90米深马萨诸塞州湾处置网站(MBDS)进行的。虽然封盖在浅水点(深度<65米深度)中取得了成功,但之前没有被证明在更深的地方有效。为了实现封顶演示的目标而没有实际使用具有不可接受的污染水平的沉积物,所指示的沉积物适用于来自Cohasset Harbor,Cohasset的Cohasset港口,Massachusetts的沉积物来表示需要封端的沉积物。代表帽的沉积物起源于切尔西河的深化疏浚项目,作为波士顿港导航改善项目(BHNIP)的一部分。 Cohasset Harbor和Chelsea河沉积物在视觉上和身体上截然不同。在Cohasset Harbal封端项目(CHCP)覆盖的不同阶段,包括基线调查,预先调查和盖板调查后,完成了一系列监测调查。盖上的土墩在86米的水中开发,超过了位于MBDS南部边界附近的0.64 km〜2面积,远离处理现场的有源区。从1998年12月到1999年2月,沉积了41,250米〜3的估计驳船量,从Cohasset港的砂质淤泥和砾石铺设,产生了0.4米高的土墩,可检测到的占地面积约600米宽。丘陵在2000年春天封装,沉积物的170,000 m〜3,主要来自切尔西河。后盖式调查表明,大多数帽累积在CHCP处理浮标的100米半径范围内。然而,帽围栏宽度超过800米,形状不规则,并且覆盖了Cohasset港沉积物的一小部分。用于记录CHCP MOIND开发的单光束沐浴池,侧扫声明,沉积物剖面成像和沉积物采样(表面抓斗和核心)调查的结果在整个示范项目中均已吻合。这些数据表明,在MBDS海底上开发了由不同沉积层组成的分层沉积物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号