RISK ANALYSIS ― HEAVY LIFTS; NORNE FPSO GAS EXPORT PROJECT

机译:风险分析 - 重型升降机; Norne FPSO天然气出口项目

获取原文

摘要

In 2000 The Nome FPSO was upgraded with an export riser and necessary process equipment for gas export. Due to high risks during installation of the new units onto the FPSO, it was decided to carry out a risk analysis of the most critical lifts. This paper concentrates on the risk analysis carried out for the lifting of one particular module, the TEG unit. The static clearance between the FPSO and the lifting vessel Regalia during the lift was very small and studies of vessel motions showed that a vessel collision could occur based on a normal vessel motion and DP inaccuracies. In particular the lift was very sensitive to the heading control of the FPSO and 1 degree heading change reduced the clearance between the vessels by 2 m. The purpose of this paper is to show that risk analyses have shown to be a very useful tool to identify where efforts in terms of economic resources and manpower should be directed to control and reduce risk prior to critical marine operation.
机译:2000年,NOME FPSO升级了出口提升机和燃气出口的必要工艺设备。由于在FPSO上安装新单元的风险高,决定对最关键的升降机进行风险分析。本文专注于对升降一个特定模块,TEG单元进行的风险分析。在升力期间FPSO和提升船Regalia之间的静态间隙非常小,并且对血管运动的研究表明,可以基于正常的血管运动和DP不准确发生血管碰撞。特别地,电梯对FPSO的前置控制非常敏感,1度标题变化将血管之间的间隙降低2米。本文的目的是表明,风险分析已显示是一个非常有用的工具,以确定经济资源和人力方面的努力,应在关键海洋操作之前控制和降低风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号