首页> 外文会议>IASTED International Conference on Modelling, Identification, and Control >EFFICIENT RE-FORMULATION OF LINEAR COGENERATION PLANNING MODELS
【24h】

EFFICIENT RE-FORMULATION OF LINEAR COGENERATION PLANNING MODELS

机译:高效再配制线性热电联产规划模型

获取原文

摘要

Recent development in the energy sector has made it necessary to create more realistic production planning and trade optimization models and to solve them more rapidly. Different kinds of cogeneration planning models can be formulated as linear programming (LP) or mixed integer programming (MIP) models, for which general solution techniques exist. We present a technique for reformulating long-term cogeneration planning models so that they can be solved much more efficiently using specialized algorithms. The technique is based on decomposing the long-term model into hourly models for individual production plants, identifying automatically the extreme points of the plant models, and re-formulating the model in terms of the extreme points as an LP/MIP model with a specialized structure that can be exploited for solving the problem much more rapidly.
机译:能源部门最近的发展使得有必要创造更加现实的生产计划和贸易优化模型,并更快地解决它们。不同种类的热电联产规划模型可以配制为线性编程(LP)或混合整数编程(MIP)模型,存在通用解决方案技术。我们提出了一种用于重新制定长期热电联产规划模型的技术,以便可以使用专用算法更有效地解决它们。该技术基于将长期模型分解为单个生产设备的每小时模型,自动识别工厂模型的极端点,并以专门的LP / MIP模型重新制定模型。可以利用的结构更快地解决问题。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号