首页> 外文会议>International Conference on Flexible Automation and Intelligent Manufacturing >A Service Target Method for Lead Time Quotation in Assembly Systems
【24h】

A Service Target Method for Lead Time Quotation in Assembly Systems

机译:装配系统中的提前时间报价的服务目标方法

获取原文

摘要

This paper presents a method to assign product due dates for assembly systems with uncertain manufacturing and assembly processing times. The parts arrive to the system as dynamic. The product completion time is the sum of system flow time and arrival time. First, through utilizing the longest path analysis in queueing networks, the distribution function of system flow time is computed by Hartley and Wortham's method [27] and it is shown that the solutions achieved are significantly much faster than those obtained by Adlakha and Kulkarni's method. Then the product completion time distribution function is computed by the convolution of system flow time and arrival time. Product due dates are assigned by meeting a service target.
机译:本文介绍了一种用于分配具有不确定制造和组装处理时间的装配系统的产品到期的方法。部件将系统达到动态。产品完成时间是系统流量时间和到达时间的总和。首先,通过利用排队网络中的最长路径分析,系统流动时间的分布函数由Hartley和Vestam的方法计算[27],结果表明,所实现的解决方案明显快于由Adlakha和Kulkarni的方法获得的解决方案。然后通过系统流动时间和到达时间的卷积来计算产品完成时间分布函数。通过满足服务目标来分配产品到期日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号