首页> 外文会议>International Offshore and Polar Engineering Conference >Cut-off Effect by Rock Grouting in the Area of Dam-foundation
【24h】

Cut-off Effect by Rock Grouting in the Area of Dam-foundation

机译:坝基地区岩石灌浆的截止效果

获取原文

摘要

The cut-off effects of rock grouting at the dam construction sites are investigated such as RQD, unit injected cement volume, Lugeon value and maximum grout pressure in the test holes. Consolidation and curtain grouting have been carried out to obtain mainly the cut-off effect against the leakage water. Lugeon tests before and after grouting in the bedrock are performed in order to estimate the permeability improved at both pilot holes and check holes. Test results show the change of permeability before and after grouting at each site. This paper presents the relationship between Lugeon values and RQD, the relationship between Lugeon values and unit injected cement volume, and the relationship between RQD and unit injected cement volume to derive any quantifiable relationship between the two factors. Finally, at the Site 2, it showed that how average injection cement volume and average Lugeon value are affected by the injection stage of adjacent injection holes from consolidation and curtain grouting.
机译:研究了岩石灌浆在大坝施工地点的截止效应,例如RQD,单位注入的水泥体积,洛氏隆值和试验孔中的最大灌浆压力。已经进行了整合和窗帘灌浆,以主要造成抗泄漏水的切断效果。在基岩中灌浆之前和之后的Lugeon测试是为了估计在两个先导孔和校验孔中的渗透率改善。测试结果显示在每个网站灌浆前后的渗透性变化。本文介绍了洛京值与RQD之间的关系,洛克斯值与单位注入水泥体积之间的关系,以及RQD和单位注入水泥体积的关系,从而导出了两个因素之间的任何可量化关系。最后,在现场2,它表明,平均注射水泥体积和平均距离的平均洛氏值是如何受到固结和窗帘灌浆的相邻注射孔的喷射阶段的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号