首页> 外文会议>International Symposium on Mine Planning and Equipment Selection >Short and Medium Term Mine Planning in Selective Underground Mining considering Equipment Performance
【24h】

Short and Medium Term Mine Planning in Selective Underground Mining considering Equipment Performance

机译:考虑设备性能的选择性地下挖掘中的短期和中期矿山规划

获取原文
获取外文期刊封面目录资料

摘要

Generally, mine planning is undertaken towards the development of production plans using fixed parameters, which provide little flexibility towards changing production plans in case of unplanned events. Therefore, it is important to introduce variables during the planning process, which would allow the mine planning to have a better alignment with real mining conditions and would allow the decrease in the operational uncertainty towards the development of a more agile production plan.The mine layout grows every day but it is very common that the equipment productivity is calculated with fixed parameters, which does not consider the size of the new developments and, thus, it does not consider the changing performance of the equipment, which will affect the mine production because of the associated changes in haulage time, variability in the equipment's tasks and other influences resulting from the changing mine layout.This paper evaluates influence of the changes in the equipment performances over a short- and medium-term mine plans on the mine production. The results show that the change in scheduling and sequencing of the activities and the new mine plan are more realistic when equipment performance is included in the evaluation in comparison with a scheduling that only considers resources constraints. The methodology was developed using tools currently available at the DELPHOS Mine Planning Laboratory, UDESS and DSIM, and by simulating the working scenario with varying performance of the equipment.
机译:一般而言,矿山规划采用固定参数开展生产计划的发展,这为在计划生计划的事件发生方面提供了不足改变生产计划的灵活性。因此,重要的是在规划过程中引入变量,这将使矿山计划与实际采矿条件更好地对齐,并将降低运营不确定性,以发展更敏捷的生产计划。矿井布局每天都会生长,但由于固定参数计算设备生产率是非常普遍的,这不考虑新的开发的规模,因此,它不考虑设备的性能不断变化,这将影响矿井生产,这将影响矿井生产,因为在运输时间的相关变化中,设备的任务的可变性以及因改变矿井布局而导致的其他影响。本文评估了在矿山生产中的短期和中期矿山计划中对设备性能变化的影响。结果表明,当与仅考虑资源限制的调度时,活动和新矿山活动的调度和排序的变化更为逼真。该方法是使用Delphos Mine规划实验室,UDESS和DSIM的目前可用的工具开发的,并通过模拟具有不同性能的工作场景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号