Long-term production scheduling in open-pit mines with special emphasis on processing plant feed constraint (Case study: Saheb Saghez iron ore mine of Iran)

机译:露天矿长期生产调度,特别强调加工植物饲料约束(案例研究:伊朗的Saheb Saghez Iron Mine)

获取原文

摘要

The issue of production planning optimization (conceptual, long-term, mid-term, short-term and daily schedules) in open pit mines is to find optimum sequence of extracting blocks from ore zone during mining cycle. In this regard, maximizing the Net present value (NPV) and minimizing required energy, especially in processing plants, play major role in productivity and effectiveness of mining operation. The role of long-term production planning optimization is very sensitive for the mine and will reduce investment risks, leading to a capital return with a logical rate in a short period. In this paper, the long-term production planning is optimized for Saheb Saghez iron ore mine located in Kurdistan Province of Iran. Considering the block modelling of ore resources based on gathered data, the economic model was first prepared. In this regard, sensitivity analysis was carried out on the ultimate pit slope for achieved economic model and 42 degree slope was selected as the appropriate and optimized slope for mine walls. Then, the final working area was determined according to the data. In the following, the geometric parameters of excavation area were estimated and the final area was designed using Studio 3 software. To optimize the production planning aiming to meet the required energy for the primary crusher, push-backs were designed to obtain proper production planning. Optimized production planning is then presented according to the objective constraints analyzed by NPV Scheduler program. Results showed that there are 864 thousand tons of economic and minable reserves with average grade of 40 percent in the final extraction area. Accordingly, the production planning, achieved using NPVS, the 200 thousand tones annual extraction of minerals to supply for the primary crusher with average grade of 40 percent, less than 1 percent sulfur for a 5-year mining period.
机译:开放坑矿山生产规划优化(概念,长期,中期,短期和日间时间表)的问题是在采矿循环期间找到从矿区从矿区提取块的最佳序列。在这方面,最大化净目的值(NPV)并最大限度地减少所需的能量,特别是在加工厂,在采矿操作的生产力和有效性中起主要作用。长期生产计划优化的作用对矿井非常敏感,并将减少投资风险,导致资本返回在短期内具有逻辑率。本文针对位于伊朗库尔德斯坦省的Saheb Saghez Iron Ori Mine优化了长期生产规划。考虑到基于收集数据的矿石资源的块建模,首先准备了经济模式。在这方面,对达到经济模型的最终坑坡进行敏感性分析,选择42度斜率作为矿井墙壁的适当和优化的斜坡。然后,根据数据确定最终工作区域。在下文中,估计了挖掘区域的几何参数,并使用Studio 3软件设计了最终区域。为了优化旨在满足主破碎机所需能量的生产规划,旨在获得适当的生产计划。然后根据NPV调度程序分析的客观约束呈现优化的生产规划。结果表明,最终提取区域的平均级别为86.4万吨经济和可致力的储量。因此,采用NPV实现的生产规划,200万色调的年度提取矿物,以普通粉碎机供应平均40%,硫磺5岁以下的矿泉群。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号