首页> 外文会议>International Symposium on Mine Planning and Equipment Selection >The unique landfill site and the mine void backfilling as solutions for the environmental safety of the abandoned mine areas
【24h】

The unique landfill site and the mine void backfilling as solutions for the environmental safety of the abandoned mine areas

机译:独特的垃圾填埋场和矿山无效回填作为废弃矿区环境安全的解决方案

获取原文

摘要

The article deals with the actions needed to achieve permanent safety conditions in the abandoned mining districts of Sardinia in which contaminated materials both from mining excavations and mineral processing plants are accumulated. Remediation solutions based on the relocation of the materials in new and engineered dumps or on materials treatment are not appropriate due to the huge volume of the deposits (the whole amount has been estimated in 70 Mm3). It appears particularly workable the use of a small number of the compromised major sites as "accumulation centres" in which materials from the other smaller abandoned areas of the same district, can be placed. This strategy has important advantages related to some typical elements of the mining areas i.e. the presence of tailing basins, often having significant surface extension, and the existence of mining voids both on the surface and underground. The use of these surfaces and volumes as "accumulation centres" introduces important technical matters referred mainly to the need of ensuring pollutants containment, to the embankments stability and to the safety condition of surface and underground voids during and after backfilling operations. The paper discuss the issues related to the selection criteria of the sites to be used as "accumulation centre" and proposes some technical solutions aimed at obtaining their permanent and global safety conditions.
机译:这篇文章涉及到实现,其中两个来自采矿挖掘工程和矿物加工工厂污染物质积累撒丁岛的废弃矿区永久安全条件需要采取的行动。根据新和工程垃圾场或材料处理的材料的搬迁整治方案是不是存款(全量在70万立方米估计)的体积庞大适当所致。这显得尤为可行的使用少量的损害各大网站作为其中来自同一地区的其他较小的废弃材料的区域,可以放在“积累中心”。这种策略与矿区尾矿即盆地,经常有显著面扩展的存在的一些典型元素的重要优势,挖掘存在空洞两个表面和地下的。作为“积聚中心”使用这些表面和体积的引入了重要的技术问题时,并回填操作后,称主要是为了需要确保污染物遏制,对堤防稳定性和地表和地下空洞的安全状况。本文讨论有关用作“蓄积中心”网站的选择标准的问题,并提出了旨在获得他们的永久和全球安全条件的一些技术解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号