【24h】

Site Experimental Analysis of Pipe Jacking Project

机译:管道顶板工程的现场实验分析

获取原文
获取外文期刊封面目录资料

摘要

This paper describes the results of field monitoring of pipe jacking undertaken in the Pipe Jacking Construction Project along Shiqiao Road in Hangzhou, China. A segment is chosen where the disturbance of soil is great and involves a pipe jack in silty soil by earth pressure balance machine (EPBM). The field-testing includes surface deformations; sub-surface movements, earth pressures, pore water pressures and underground water levels on the location. In addition, the total jacking forces and earth pressures in EPBM are also recorded. These measured data are used to study the disturbance and movement of soil during the course of pipe jacking. The results of these tests indicate the values of surface deformations, sub-surface movements, earth pressures, pore water pressures and underground water levels are related to the distance between shield and testing section.
机译:本文介绍了中国杭州市石桥路管道施工项目中采用管道顶升现场监测的结果。选择土壤的干扰是伟大的,通过地球压力平衡机(EPBM)涉及粉质土壤的管千斤顶。现场测试包括表面变形;地面运动,地面压力,孔隙水压和地下水位上的位置。此外,还记录了EPBM中的总顶伸部和地球压力。这些测量的数据用于研究土壤在管道后的烘干和运动。这些测试的结果表明表面变形,亚表面运动,地球压力,孔隙水压力和地下水位的值与屏蔽和测试部分之间的距离有关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号