【24h】

Settlement Analysis of Pakpanang Closure Dam

机译:Pakpanang Closure Dam的结算分析

获取原文
获取外文期刊封面目录资料

摘要

This paper proposed the settlement predictions of Pakpanang closure dam constructed on soil-cement column. The spacing of studies soil-cement column was over the limitation of Broms&Boman (1977) and Sweroad (1992) methods. The assumption of equivalent footing at the depth of 2L/3 length of column and at the end of column for conventional method were therefore applied. Settlement analyses were conducted using Terzaghi&Peck (1948) and Duncan&Buchignani (1976) theories. The coefficient of vertical consolidation (C_v) calculated by Asaoka (1978) method conforms to the actual settlement. Asaoka's graphic method was the best predictor with 3 percent different from the actual settlement rate. Furthermore, lateral displacements were determined. The maximum lateral displacement was found at 12th month, which is 24.53 mm at the center of the closure dam in the direction of downstream.
机译:本文提出了土壤 - 水泥柱构建的Pakpanang封闭坝的沉降预测。研究的间距土壤 - 水泥柱是在Broms&Boman(1977)和SweRoad(1992)方法的限制。因此,施加了在2L / 3长度的深度和常规方法的柱末端的深度处的等效基位的假设。使用Terzaghi&Peck(1948)和Duncan&Buchignani(1976)理论进行了结算分析。 ASAOKA(1978)方法计算的垂直固结(C_V)系数符合实际沉降。 Asaoka的图形方法是最佳预测因子,与实际结算率不同3%。此外,确定横向位移。最大横向位移在12个月内找到,在下游方向的封闭坝的中心处为24.53mm。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号