首页> 外文会议>Asian regional conference on soil mechanics and geotechnical engineering >Integrated soil investigation works off marina east, Singapore
【24h】

Integrated soil investigation works off marina east, Singapore

机译:综合土壤调查距离新加坡码头东部

获取原文

摘要

As part of preliminary site investigation for the Marina East area, an extensive soil investigation works were planned. The project site is located in waters off Marina East, Singapore. . The whole project site covered an area of around 600 Hectare. The water depth at the project area varies from 0 m CD to -23 m CD. The seabed within the project site is mainly covered by Kallang Formation and Old Alluvium. The seabed geology, in particular, the thickness and distribution of the soft sediment and soft clay within this project site, as well as the strength and stiffness characteristic of these soft deposit are the main concerns for any new development over this site. The knowledge of seabed geology and the engineering properties will help in deciding the appropriate facilities to be built or/and the appropriate method of construction. In view of the nature of the design requirements, an integrated soil investigation works has been designed. This includes 4 key components: seismic survey, CPT, borehole, and Large Diameter Borehole. Proper planning and management was significant for such a mega soil investigation project, which covers a huge project area and includes a few different types of work.
机译:作为滨海东部地区初步现场调查的一部分,计划了一项广泛的土壤调查作品。项目网站位于新加坡码头东部的水域。 。整个项目现场覆盖了大约600公顷的面积。项目区域的水深从0米CD变化到-23米CD。项目网站内的海底主要由Kallang Cloction和Old Alluvium覆盖。特别是该项目现场软沉积物和软粘土的厚度和分布,以及这些软矿床的强度和刚度特征是对该网站的任何新发展的主要问题。海底地质学和工程物业的知识将有助于决定建造或/和适当的建筑方法的适当设施。鉴于设计要求的性质,设计了一种集成的土壤调查作品。这包括4个关键组分:地震测量,CPT,钻孔和大直径钻孔。适当的规划和管理对于此类巨型土壤调查项目非常重要,该项目涵盖了一个庞大的项目区域,包括一些不同类型的工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号