The UP1 plant in Marcoule reprocessed nearly 20,000 tons of used natural uranium gas cooled reactor fuel coming from the first generation of civil nuclear reactors in France. During more than 40 years, the decladding operations produced thousands of tons of processed waste, mainly magnesium and graphite fragments. In the absence of a French repository for the graphite waste, the graphite sludge content of the storage pit had to be retrieved and transferred into a newer and safer pit. So, this project consists in the full retrieval and transfer of 15 m~3 of water mixed with graphite dust located in the decladding facility, as well as the complete cleanup and decontamination of the pit. The equipment and process necessary for retrieval operations were designed, built and tested. The process is mainly based on the use of two pumps (one to capture and the other one to transfer the sludge) working one after the other and a robotic arm mounted on a telescopic mast. A dedicated process was also set up for the removal of the biggest fragments. In the pit, the sludge retrieval and transfer operations have been almost completed. Most of the non-pumpable graphite fragments has been removed and transferred to a new storage pit. As irradiant fragments have been discovered in the pit, specific studies are in progress in order to remove them to the laboratory for dissolution. This work is expected to 2014.
机译:Marcoule的UP1植物再加工来自法国第一代民用核反应堆的二手天然铀气体冷却反应堆燃料。在40多年以上,拒绝行动产生了数千吨加工废物,主要是镁和石墨片段。在没有法式储存的法式储存的情况下,必须检索储存坑的石墨污泥含量并转移到更新和更安全的坑中。因此,该项目的完全检索和转移15米〜3的水与位于拒绝设施中的石墨灰尘,以及坑的完全清理和净化。检索操作所需的设备和工艺是设计,构建和测试的。该过程主要基于使用两个泵(一个捕获和另一个捕获的污泥),在另一个之后工作,并且安装在伸缩式桅杆上的机器人臂。还设立了专用流程来删除最大的碎片。在坑里,污泥检索和转移操作几乎已经完成。大多数不泵送石墨片段已被移除并转移到新的储存坑中。由于在坑中发现了辐射碎片,因此正在进行具体研究以将它们除去它们以进行溶解的实验室。这项工作预计2014年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号