首页> 外文会议>International Conference on Environmental Remediation and Radioactive Waste Management >IMPROVED PRACTICES FOR PACKAGING TRANSURANIC WASTE AT LOS ALAMOS NATIONAL LABORATORY (LA-UR-09-03293)
【24h】

IMPROVED PRACTICES FOR PACKAGING TRANSURANIC WASTE AT LOS ALAMOS NATIONAL LABORATORY (LA-UR-09-03293)

机译:洛杉矶阿拉莫斯国家实验室包装经阵容废物的改进实践(La-UR-09-03293)

获取原文

摘要

Transuranic (TRU) waste leaving the Plutonium Facility at Los Alamos National Laboratory (LANL) is packaged using LANL's waste acceptance criteria for onsite storage. Before shipment to the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico, each payload container is subject to rigorous characterization to ensure compliance with WIPP waste acceptance criteria and Department of Transportation regulations. Techniques used for waste characterization include nondestructive examination by WIPP-certified real-time radiography (RTR) and nondestructive assay (NDA) of containers, as well as headspace gas sampling to ensure that hydrogen and other flammable gases remain at safe levels during transport. These techniques are performed under a rigorous quality assurance program to confirm that results are accurate and reproducible. If containers are deemed problematic, corrective action is implemented before they are shipped to WIPP. A defensive approach was used for many years to minimize the number of problematic drums. However, based on review of data associated with headspace gas sampling, NDA and RTR results, and enhanced coordination with the entities responsible for waste certification, many changes have been implemented to facilitate packaging of TRU waste drums with higher isotopic loading at the Plutonium Facility at an unprecedented rate while ensuring compliance with waste acceptance criteria. This paper summarizes the details of technical changes and related administrative coordination activities, such as information sharing among the certification entities, generators, waste packagers, and shippers. It discusses the results of all such cumulative changes that have been implemented at the Plutonium Facility and gives readers a preview of what LANL has accomplished to expeditiously certify and dispose of newly generated TRU waste.
机译:Transuranic(Tru)废物离开Los Alamos国家实验室(LANL)的钚设施采用LANL废物验收标准进行包装,用于现场存放。在发货之前,在新墨西哥州东南部的废物隔离试验工厂(WIPP)之前,每个有效载荷容器都受到严格的表征,以确保遵守WIPP废物验收标准和运输部门。用于废物表征的技术包括通过WIPP认证的实时射线照相(RTR)和容器的无损测定(NDA)的无损检查,以及顶空气采样,以确保在运输过程中剩余的氢和其他易燃气体保持安全水平。这些技术在严格的质量保证程序下进行,以确认结果是准确和可重复的。如果容器被认为是有问题的,则在运送到WIPP之前实施纠正措施。使用防御方法多年来,以最小化问题鼓的数量。然而,基于审查与头孢星气体采样相关的数据,NDA和RTR结果,并加强与负责废物认证的实体的协调,已经实施了许多变化,以便于在钚设施中具有更高的同位素负载的特鲁斯废话鼓的包装确保遵守废物验收标准的前所未有的速度。本文总结了技术变革和相关行政协调活动的细节,例如认证实体,发电机,废物包装和托运人之间的信息共享。它讨论了钚设施在钚设施中实施的所有此类累积变化的结果,并为读者提供了LANL所完成的预测,以迅速认证和处置新生成的TRU浪费。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号