首页> 外文会议>Mill operators' conference >The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper Concentrator
【24h】

The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper Concentrator

机译:浮选能力项目增加伊萨矿山矿山铜集中器中的恢复

获取原文

摘要

The installation of the Flotation Capacity Project flow sheet in the copper concentrator at Mount Isa Mines Limited has recently been completed. The project involved increasing the flotation capacity with Wemco tank cells and Jameson cells as well as changing the copper cleaner circuit layout. The engineering design and construction for the brownfield expansion had significant involvement from operational, maintenance and technical personnel adopting the same approach as the highly successful George Fisher project in the Lead/Zinc Concentrator at MIM. The involvement of people familiar with the concentrator allowed for smooth integration of the changes into an operating concentrator with minimal downtime. Detailed circuit analysis over many years identified opportunities for improvements in the flotation circuit for both grade and recovery. This paper describes the program of work that led to the Copper Concentrator Flotation Capacity Project, and the implementation of the circuit expansion and flow sheet changes that resulted in an overall improvement in the circuit recovery.
机译:最近已经完成了ISA Mines Limited山矿铜集中器中的浮选容量项目流量表的安装。该项目涉及将浮选能力增加与WEMCO坦克电池和詹姆森电池以及改变铜清洁电路布局。 Brownfield扩展的工程设计和施工具有从运营,维护和技术人员中的显着参与,采用与MIM的引线/锌集中器中的高度成功的乔治Fisher项目相同的方法。熟悉集中器的人们参与允许将变化的平滑集成到具有最小停机时间的操作集中器中。多年来的详细电路分析确定了浮选电路的改进机会,用于等级和恢复。本文介绍了导致铜集中器浮选容量项目的工作方案,以及电路膨胀和流动纸张变化的实现,导致电路恢复的总体改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号