The amount of process heat which affects the operation condition of a biomass-fired cogeneration power plant was studied. The operating modes under the investigation are the full (81.9 MW) and partial boiler loads. At a process heat of less than 16.53 MW, the turbine is over the design capacity (24 MW) if operated under the full load condition. In the partial load operation, there is a limit value of the process steam demand for each electricity generating capacity so that the boiler does not exceed its maximum thermal load. For the electricity outputs of 22, 23, and 24 MW, the maximum allowable process steam are 25.67, 21.09, and 16.53 MW, respectively. The maximum possible cogeneration efficiency is 64.63 percent when the power plant is operated with the partial boiler load generating 19 MW electricity and 30 MW steam. But financially the power plant should be operated wikth the full load mode.
机译:研究了影响生物质烧制的热电厂发电厂的操作条件的过程热量。调查下的操作模式是完整的(81.9 MW)和部分锅炉负荷。在小于16.53mW的过程中,涡轮机在全负载条件下操作时越过设计容量(24 MW)。在部分负载操作中,对每个发电能力的过程蒸汽需求的限制值,使得锅炉不超过其最大热负荷。对于22,23和24 MW的电力输出,最大允许的过程蒸汽分别为25.67,21.09和16.53mW。当电厂使用部分锅炉负荷和30 MW蒸汽运行电厂运行时,最大可能的热电联产效率为64.63%。但经济上的电厂应经营Wikth全负载模式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号