首页> 外文会议>Copper-Cobre international conferences >The phase III expansion of Altonorte Copper Smelter, Chile
【24h】

The phase III expansion of Altonorte Copper Smelter, Chile

机译:Altonorte铜冶炼厂的第三阶段扩张,智利

获取原文

摘要

This paper describes the implementation of the Phase III expansion project at Noranda's Altonorte smelter near Antofagasta, Chile, to increase its concentrate smelting capacity to at least 820,000 tpa, with the potential of treating up to 1,000,000 tpa by the installation of a new continuous Reactor. The previous capacity was 400,000 tpa through an oxyfuel reverberatory furnace and the injection of bone dry concentrates via tuyeres of Peirce-Smith converters. The Reactor will principally treat injected dry concentrate and, together with additional equipment, both new and used, will ensure high availability, increased recovery and will meet stricter environmental standards. The paper describes the process design, the project execution schedule, a review of the major equipment, logistical challenges and detailed design of some of the equipment.
机译:本文介绍了诺兰达的Altonorte冶炼厂在Antofagasta,智利附近的III阶段扩建项目的实施,以将其集中熔炼能力增加到至少820,000吨,具有通过安装新的连续反应堆来治疗高达1,000,000 TPA的潜力。通过氧气混响炉,之前的容量为40万吨,通过Peirce-Smith转换器的Tuyeres注入骨干浓缩物。反应器主要将注入的干浓缩物,以及额外的设备,既有新的和使用,都将确保高可用性,恢复增加,并会符合更严格的环境标准。本文介绍了过程设计,项目执行时间表,对主要设备的审查,后勤挑战和一些设备的详细设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号