The phase III expansion of Altonorte Copper Smelter, Chile

机译:智利Altonorte铜冶炼厂三期扩建

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the implementation of the Phase III expansion project at Noranda's Altonorte smelter near Antofagasta, Chile, to increase its concentrate smelting capacity to at least 820,000 tpa, with the potential of treating up to 1,000,000 tpa by the installation of a new continuous Reactor. The previous capacity was 400,000 tpa through an oxyfuel reverberatory furnace and the injection of bone dry concentrates via tuyeres of Peirce-Smith converters. The Reactor will principally treat injected dry concentrate and, together with additional equipment, both new and used, will ensure high availability, increased recovery and will meet stricter environmental standards. The paper describes the process design, the project execution schedule, a review of the major equipment, logistical challenges and detailed design of some of the equipment.
机译:本文介绍了在智利安托法加斯塔附近的诺兰达Altonorte冶炼厂进行的第三阶段扩建项目的实施,以将其精矿冶炼能力提高到至少820,000 tpa,并可能通过安装新的连续反应器来处理高达1,000,000 tpa的潜力。以前的容量是通过氧燃料反射炉和通过Peirce-Smith转炉的风口注入骨干精矿而获得的40万吨/年。该反应堆将主要处理注入的干浓缩物,并与新的和二手的附加设备一起确保高可用性,增加的回收率并满足更严格的环境标准。本文描述了过程设计,项目执行进度,主要设备的回顾,后勤挑战以及某些设备的详细设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号