With reference to outlines and procedures of design and building process planning inside a pre-casting plant, it has been analyzed valuation and cost optimization phases tied to the production of a particular precasted element. Important role has been given to the identification of variables necessaries in cost function determination. A calculation model has been proposed for cost optimization; this model has been applied in the comparison between two different technological solutions.
展开▼