首页> 外文会议>Safety in Ammonia Plants Related Facilities Symposium >Woodward, Oklahoma Ammonia Converter Revamp: More Efficiency and Reliability through Innovation
【24h】

Woodward, Oklahoma Ammonia Converter Revamp: More Efficiency and Reliability through Innovation

机译:伍德沃德,俄克拉荷马亚莫利亚转换器改造:通过创新更具效率和可靠性

获取原文

摘要

With many ammonia plants already stretched to capacities in excess of150% of their original nameplate, many are contemplating an ammonia converter revamp as part of the next evolution in increasing their production capability. For many, such projects are a once in a career event, and there is much that can be gained from sharing the details of ammonia converter projects that have already been completed successfully. An excellent example of such a project was completed at the CF Industries plant in Woodward, Oklahoma in early 2009. This plant's attention to safety, diligent planning, and close working relationship with their technology provider and catalyst supplier ensured the safety and success of this project.
机译:许多氨植物已经延伸到其原始铭牌超过150%的容量,许多人正在考虑氨转化器改造,作为下一步演变的一部分,以提高其生产能力。对于许多人来说,这些项目是一个职业生涯中的一次,并且可以从分享已经成功完成的氨变换器项目的细节中获得了很多。在2009年初在俄克拉荷马州伍德沃德的CF行业植物中完成了这一项目的一个很好的例子。该工厂对与其技术提供商和催化剂供应商的安全性,勤奋规划和密切的工作关系确保了该项目的安全性和成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号