首页> 外文会议>International Conference on Environmental Systems >International Space Station (ISS) United States (US) laboratory module environmental control and life support (ECLS) system close-out process for launch
【24h】

International Space Station (ISS) United States (US) laboratory module environmental control and life support (ECLS) system close-out process for launch

机译:国际空间站(ISS)美国(美国)实验室模块环境控制和生命支持(ECLS)系统关闭过程

获取原文

摘要

The International Space Station (ISS) United States Laboratory module has been under test for approximately two years in the Space Station Processing Facility (SSPF) at NASA Kennedy Space Center (KSC) preparing for launch. Preparation activities for closing out the Environmental Control and Life Support (ECLS) system have included Closed Hatch testing to verify the capability of the life support equipment to support the crew, final manufacturing steps, and the close-out process itself. These activities were accomplished by an integrated Boeing and NASA team, located at the Johnson Space Center (Houston, Texas), Marshall Space Flight Center (Huntsville, Alabama) and Kennedy Space Center, Florida. On December 13, the Laboratory module hatches were sealed prior to loading into the Shuttle Orbiter payload bay for launch on February 7, 2001. This paper will address the Laboratory module ECLS hardware configuration including off-gas testing, baseline cabin sampling used to compute initial on- orbit ingress contaminant load, final purge, and cabin pressure adjustment for launch.
机译:国际空间站(ISS)美国实验室模块已经在航天站加工设施(SSPF)在NASA肯尼迪航天中心(KSC)准备发射时进行了大约两年。用于关闭环境控制和生命支持(ECLS)系统的制备活动包括封闭的舱室测试,以验证生命支持设备的能力,以支持机组人员,最终制造步骤和特写过程本身。这些活动是由一个集成的波音和美国宇航局团队完成,位于约翰逊航天中心(德克萨斯州休斯顿),马歇尔空间飞行中心(亨茨维尔,阿拉巴马州)和佛罗里达州肯尼迪航天中心。 12月13日,在2001年2月7日装入梭子轨道有效载荷之前,将实验室模块舱口被密封。本文将解决实验室模块ECLS硬件配置,包括废气测试,用于计算初始的基准机舱采样。用于计算初始的基准机舱采样轨道入口污染物负荷,最终吹扫和驾驶室压力调节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号