首页> 外文会议>World energy engineering congress and environmental technology expo >POLLUTION PREVENTION AND ENERGY EFFICIENCY (P_2E_2) PROGRAMS Creating a Solid Foundation for Success
【24h】

POLLUTION PREVENTION AND ENERGY EFFICIENCY (P_2E_2) PROGRAMS Creating a Solid Foundation for Success

机译:污染预防和能源效率(P_2E_2)计划为成功创造坚实的基础

获取原文

摘要

Many facility owners and managers are looking for ways to decrease costs and improve operations. To help insure that these efforts are not mutually exclusive, P_2E_2 can be used as the tool to uncover many opportunities and position the facility for improved performance. Pollution Prevention (P_2) programs and Energy Efficiency (E_2) programs have both been around for many years. However, when these efforts are combined into a single program, the opportunity for a synergism occurs and a facility can obtain many more benefits than from either program alone. The most important aspect of developing a P_2E_2 program is creating a solid foundation from which to build the rest of the program. This paper discusses the development of the first two major steps of the program: 1. Preliminary Program Development, and 2. Facility Analysis and Evaluation. The actual development of a P_2E_2 for the Wm. Wrigley Jr. Company is discussed throughout the paper to illustrate the application of the program development. Summarized results from the study from one facility are included to show the potential opportunities evaluated for one particular facility. Once these steps have been completed, the facility management is presented with a comprehensive report that outlines the opportunities to reduce costs and improve operations. At this point the program moves from the analysis phase to the master plan development. This phase is discussed in Part Two of this series.
机译:许多设施所有者和管理人员正在寻找减少成本和改善操作的方法。为了帮助确保这些努力不是相互排斥的,可以将P_2E_2用作揭示许多机会并将设施定位以提高性能的工具。污染预防(P_2)计划和能源效率(E_2)方案已经存在多年。然而,当这些努力被组合成一个程序时,发生协同作用的机会,并且设施可以获得比单独的任何程序更多的好处。开发P_2E_2程序的最重要方面正在创建一个坚实的基础,从中建立该程序的其余部分。本文讨论了该计划的前两个主要步骤的开发:1。初步计划开发和2.设施分析和评估。 WM的P_2E_2的实际开发。 riggley Jr.公司在整个论文中讨论,以说明计划开发的应用。包括从一个设施的研究的总结结果,以显示对一个特定设施评估的潜在机会。一旦这些步骤完成,设施管理就会提供一份全面的报告,概述了降低成本和改善业务的机会。此时,程序从分析阶段移动到主计划开发。该阶段在本系列中的第二部分讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号