THE MONITORING AND TREATMENT OF THE DRILL CUTTINGS ACCUMULATION DURING OPERATION AND DECOMMISSIONING - MAUREEN ALPHA, BLOCK 16/29A UKCS

机译:运行和退役期间钻削和处理的监测和处理 - Maureen alpha,块16/29a Ukcs

获取原文

摘要

As a first phase in its decommissioning the Maureen Alpha Steel Gravity Base platform was refloated from Block 16/29A on the United Kingdom Continental Shelf to Norway in late June 2001. In order to carry out this decommissioning the Maureen Owners, through the Operator, Phillips Petroleum Company United Kingdom Limited, had to obtain approval from the UK Govemment of a Decommissioning Programme to be executed in accordance with the UK Petroleum Act 1998 and its Decommissioning Guidelines. In compiling the Decommissioning Programme the Maureen Operator needed to consider inter alia the environmental aspects of all its operations. Into this analysis came the issue of the Drill Cuttings accumulation which lay beneath and beyond the platform. This paper will describe the factors and methodology used to develop the position taken with respect to treatment of the historic drill cuttings accumulation arising from drilling 26 wells. At the time of the preparation of the Decommissioning Programme (early 2000) until the refloat of the platform, the Environmental Non Governmental Organisations were keenly interested in the fate of drill cuttings and the Oil Industry in the UK was carrying out a project to determine the impact and management issues around such accumulations. The seabed around Maureen had been sampled extensively before drilling and throughout field life. This was significant within the development at the Decommissioning Programme. The paper will include discussion of Drilling History, long term monitoring, recovery of species diversity, links to industry study work, peer and academic review, disturbance modelling, environmental modelling and the actual disturbance of the cuttings at the time of refloat.
机译:作为退役的第一阶段,Maureen alpha钢重力基础平台回到2001年6月底以英国大陆架上的街区16/29a回归。为了通过运营商,菲利普斯进行这次退役的莫琳所有者石油公司英国有限公司,必须根据1998年英国石油法案及其退役准则获得批准的英国加州议长批准。在编制退役计划时,Maureen算子尤其需要考虑所有运营的环境方面。进入这个分析来了解钻屑积累的问题,它躺在平台下方。本文将描述用于制定关于钻探26孔产生的历史钻削扦插积累的历史钻削扦插积累所采取的位置的因素和方法。在准备退役计划(2000年初)直到落后平台的反映时,环保非政府组织对钻扦插命运和英国石油工业的命运敏感,正在进行一个项目来确定此类积累周围的影响和管理问题。在钻井之前,Maureen周围的海床已经在钻井前和整个场地生活中进行了宣传。这在退役计划的发展中是重要的。本文将包括钻探历史,长期监测,物种多样性恢复,与行业学习工作,同行和学术评论,扰动建模,环境建模以及倒车时的实际干扰的联系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号