THE MONITORING AND TREATMENT OF THE DRILL CUTTINGS ACCUMULATION DURING OPERATION AND DECOMMISSIONING - MAUREEN ALPHA, BLOCK 16/29A UKCS

机译:在操作和退役期间对钻头切割累积的监测和处理-UKCS 16 / 29A座的莫琳·阿尔法

获取原文

摘要

As a first phase in its decommissioning the Maureen Alpha Steel Gravity Base platform was refloated from Block 16/29A on the United Kingdom Continental Shelf to Norway in late June 2001. In order to carry out this decommissioning the Maureen Owners, through the Operator, Phillips Petroleum Company United Kingdom Limited, had to obtain approval from the UK Govemment of a Decommissioning Programme to be executed in accordance with the UK Petroleum Act 1998 and its Decommissioning Guidelines. In compiling the Decommissioning Programme the Maureen Operator needed to consider inter alia the environmental aspects of all its operations. Into this analysis came the issue of the Drill Cuttings accumulation which lay beneath and beyond the platform. This paper will describe the factors and methodology used to develop the position taken with respect to treatment of the historic drill cuttings accumulation arising from drilling 26 wells. At the time of the preparation of the Decommissioning Programme (early 2000) until the refloat of the platform, the Environmental Non Governmental Organisations were keenly interested in the fate of drill cuttings and the Oil Industry in the UK was carrying out a project to determine the impact and management issues around such accumulations. The seabed around Maureen had been sampled extensively before drilling and throughout field life. This was significant within the development at the Decommissioning Programme. The paper will include discussion of Drilling History, long term monitoring, recovery of species diversity, links to industry study work, peer and academic review, disturbance modelling, environmental modelling and the actual disturbance of the cuttings at the time of refloat.
机译:作为退役的第一阶段,莫林Alpha钢重力基座平台已于2001年6月下旬从英国大陆架上的16 / 29A区块重新运往挪威。为了进行此停运,莫林所有者通过运营商菲利普斯(Phillips)英国石油公司有限公司必须根据英国1998年《石油法》及其退役指南获得英国政府批准的退役计划。在编制退役计划时,莫林运营人需要特别考虑其所有运营的环境方面。该分析涉及平台下方和上方的钻屑堆积问题。本文将描述用于确定因钻探26口井而产生的历史钻屑堆积的位置的因素和方法。在准备退役计划(2000年初)直到平台退役之前,环境非政府组织对钻屑的命运非常感兴趣,英国的石油工业正在实施一个项目来确定钻屑的数量。此类累积带来的影响和管理问题。在钻探之前和整个油田寿命期间,对Maureen周围的海底进行了广泛的采样。这在退役计划的开发中意义重大。本文将包括钻井历史的讨论,长期监测,物种多样性的恢复,与行业研究工作的链接,同行和学术评论,扰动建模,环境建模以及再造时切屑的实际扰动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号