首页> 外文会议>International Conference on HYDROTRANSPORT >Antamina's copper and zinc concentrate pipeline incorporates advanced technologies
【24h】

Antamina's copper and zinc concentrate pipeline incorporates advanced technologies

机译:安米丽娜的铜和锌精矿管道包含先进的技术

获取原文

摘要

East of Huscaran National Park, in the Peruvian Andes, is the Antamina Mine. A 302-km-long slurry pipeline, commissioned in July 2001, transports concentrates of copper and zinc, as separate batches, from an elevation of 4,200 m to sea level. Antamina's pipeline incorporates many new technologies. High-pressure PD pumps, high-pressure pipeline with RDPE lining, high-headloss adjustable choke stations, durable ceramic chokes, comprehensive computer simulation, computer-based batch tracking, leak detection and operation advisory, and trail-out prediction are among them. This paper addresses primarily the technical challenges in preventing slack flow and over-pressure in the pipeline while batches (copper slurry/water/zinc slurry) of significantly different densities move through the pipeline in mountainous terrain.
机译:在Huscaran国家公园的东部,在秘鲁安第斯山脉,是南岛矿。一个302公里长的浆料管道,2001年7月委托,将铜和锌的浓缩物作为单独的批次运输,从4,200米到海平面。安大米那的管道包含许多新技术。高压PD泵,带RDPE衬里的高压管道,高头轴调节扼流圈站,耐用陶瓷窒息,综合电脑仿真,基于计算机的批量跟踪,泄漏检测和操作咨询,以及路径预测。本文主要提出了防止管道流动和过压的技术挑战,而批次(铜浆/水/锌浆料)显着不同的密度在山区地形中的管道上移动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号