首页> 外文会议>European-Japanese Conference on Information Modelling and Knowledge Bases >Time Contexts in Document-Driven Projects on the Web: From Time-Sensitive Links towards an Ontology of Time
【24h】

Time Contexts in Document-Driven Projects on the Web: From Time-Sensitive Links towards an Ontology of Time

机译:Web上文档驱动项目中的时间上下文:从时敏链接到时间的时间

获取原文

摘要

Time is the core resource of a project. A project combines human and non-human resources together into a temporary organization that aims to achieve a specified objective. A project has a temporal structure of its own, with related operations and deliverables that also are functions of time. In knowledge-intensive organizations, more and more projects are distributed, document-driven processes with parallel phases and tasks. Change management between parallel phases and tasks with associated documents has become one of the core functions in distributed project management. In our paper, we present a framework for time contexts in distributed project management environments, particularly from a project manager's point of view. In document-driven projects, document life-cycles, the statuses of documents, temporal relations between documents, all define the document logistics of a project and describe the overall temporal structure of a project. We analyze the life-cycles of project documents with related time statuses and temporal relations between different documents. We apply time-sensitive links to illustrate the temporal characteristics of project documents and to construct time-based navigation support through the life-cycles and temporal relations of the project documents in single and simple project environments. Our approach is designed to be applied especially to the analysis phase of document logistics from a time-based project management point of view before an organization selects and implements a commercial or customized distributed project management system. We extend our approach to more complex, multi-project environments. We discuss an ontology of time, and Topic Maps as a means of analyzing, deriving and managing time rule sets separated from project document space. The focus of our approach is on knowledge-intensive organizations, on Web-based document-centric projects and on solutions based on W3C Recommendations.
机译:时间是项目的核心资源。项目将人和非人力资源结合在一起,旨在实现特定目标的临时组织。项目具有自己的时间结构,具有相关的操作和可交付成果,也是时间的函数。在知识密集型的组织中,越来越多的项目是分发的,文档驱动的流程,并行阶段和任务。使用关联文档的并行阶段和任务之间的更改管理已成为分布式项目管理中的核心功能之一。在我们的论文中,我们为分布式项目管理环境中的时间上下文提供了一个框架,特别是来自项目经理的角度来看。在文档驱动的项目中,文档生命周期,文档状态,文档之间的时间关系,所有这些都定义了项目的文档物流,并描述了项目的整体时间结构。我们将项目文档的生命周期分析了不同文件之间的相关时间状态和时间关系。我们应用时间敏感的链接以说明项目文档的时间特征,并通过单一和简单项目环境中项目文档的生命周期和时间关系构建基于时间的导航支持。我们的方法旨在尤其适用于从组织选择并实现商业或定制分布式项目管理系统之前的基于时间的项目管理的文档物流的分析阶段。我们将我们的方法扩展到更复杂,多项目环境。我们讨论了时间的本体论,主题映射作为分析,导出和管理与项目文档空间中分离的时间规则集的手段。我们的方法的重点是知识密集型组织,基于网络的文档为中心的项目和基于W3C建议的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号