首页> 外文会议>Power-Gen Europe Annual Conference Exhibition >EnBW REPOWERING PROJECT IN RDK EXPERIENCE WITH THE ALSTOM GT26 GAS TURBINE
【24h】

EnBW REPOWERING PROJECT IN RDK EXPERIENCE WITH THE ALSTOM GT26 GAS TURBINE

机译:用Alstom GT26燃气轮机RDK经验中重新推回项目

获取原文

摘要

EnBW Kraftwerke AG is a 100% subsidiary of EnBW AG, Karlsruhe, one of the largest German Utilities. The company operates nuclear power plants, conventional power plants, hydro, wind and regenerative plants for the generation of energy and heat. The business activity is mainly focused on the European Market. Long-term supply agreements signed in 1993 committed the company to providing top performance. To be able to meet this obligation, the company decided in 1995 to upgrade unit 4 of the Rheinhafen steam power plant (Rheinhafen-Dampfkraftwerk -RDK), from a hard coal unit into a modern, peak-load, combined-cycle power plant and to increase the unit output from 100 MW to approx. 360 MW. At that time Unit 4 had been out of operation.
机译:Enbw Kraftwerke AG是德国公司最大的德国公用事业之一enbw ag的100%子公司。该公司运营核电厂,传统发电厂,水电,风和再生植物,用于产生能量和热量。商业活动主要集中在欧洲市场。 1993年签署的长期供应协议致力于本公司提供最高绩效。为了能够履行这一义务,该公司于1995年决定将Rheinhafen蒸汽发电厂(Rheinhafen-Dampfkraftwerk -RDK)的单元4升级,从硬煤单元到现代,峰值负荷,联合循环发电厂和将单位从100 MW增加到约。 360兆瓦。此时单元4已经失效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号