Risk-informed decisions optimization in inspection and maintenance

机译:风险明智的决策在检查和维护中优化

获取原文

摘要

The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in partial case is used for the construction and research of the models related to inspections and maintenance planning of Ignalina Nuclear Power Plant (RBMK-1500) piping components. The discussed example is related to risk analysis and inspection program improvements for selected pipe systems. The new risk-informed inspection and maintenance program for selected pipe systems are compared with various alternatives. The usage of risk evaluations to optimize the selection of inspection locations, the inspection interval, and the changes in risk and cost due suggested modifications are demonstrated. The proposed integrated modeling methodic and general model of inspection process can be used as a base for other risk-informed models of inspection process control and risk monitors of complex dynamic systems.
机译:审议了用于支持与检验和维护计划相关的决策的风险知情方法(RIA)。使用风险知情方法可以帮助重点关注适当的服务,对复杂动态系统的更重要的位置。将重点设定为测量为条件核心损伤频率的最高风险,这是通过不同位置的劣化和最终故障的频率产生的,与条件失效后果概率相结合。每年不同降解状态的概率和后果的定量估计。检查和维护过程的调查是基于一般风险明智的模型的确定性和概率分析的结合,包括检查和维护计划功能。此类RIA允许优化检查程序,同时保持概率和基本的确定性安全要求。使用故障统计分析以及检查可靠性的评估。关于检查方法的有效性的假设是基于检查期间焊缝可达性的分类,以及用于检查的不同技术。假设缺陷检测的概率通过对数或Logit转换取决于参数。例如,分析了管道系统检查过程的建模。减少了许多检查网站和累积辐射对NPP检验人员的累积辐射的手段,与使用的和开发的软件一起呈现了整体风险。开发的软件可以执行和管理所有风险评估,并确保比较不同选项并执行敏感性分析的可能性。讨论了定义可接受风险水平的方法。这些方法在部分案例中具有适当的软件,用于建设和研究与伊格拉南核电站(RBMK-1500)管道组件的检查和维护规划相关的模型。讨论的示例与所选管道系统的风险分析和检测程序改进有关。与各种替代方案进行比较了用于选定管道系统的新风险的明智的检查和维护计划。风险评估的使用来优化检查位置,检验间隔和风险的变化以及成本所建议的修改的选择。建议的综合建模方法和检查过程的一般模型可以用作其他风险信息的检验过程控制和风险监视器的复杂动态系统的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号