首页> 外文会议>International Conference on Nuclear Engineering >Restructuring the uranium mining industry in Romania-actual situation and prospects
【24h】

Restructuring the uranium mining industry in Romania-actual situation and prospects

机译:在罗马尼亚 - 实际情况和前景中重组铀矿业

获取原文

摘要

Uranium prospecting in Romania has started some 50 years ago, when a bilateral agreement between Romania and the former Soviet Union had been concluded and a joint Romanian-Soviet enterprise was created. The production started in 1952 by the opening of some deposits from western Transylvania (Bihor and Ciudanovita). From 1962 the production has continued only with Romanian participation on the ore deposit Avram lancu and from 1985 on the deposits from Eastern Carpathians (Crucea and Botusana). Starting with 1978 the extracted ores have been completely processed in the Uranium Ore Processing Plant from Feldioara, Brasov. Complying with the initial stipulations of the Nuclear National Program launched at the beginning of the 1980s, the construction of a nuclear power station in Cernavoda has started in Romania, using natural uranium and heavy water (CANDU type), having five units of 650 MW installed capacity. After 1989 this initial Nuclear National Program was revised and the construction of the first unit (number 1) was finalized and put in operation in 1996. In 2001 the works at the unit number 2 were resumed, having the year 2005 as the scheduled activating date. The future of the other 3 units, being in different construction phases, hasn't been clearly decided. Taking into consideration the exhaustion degree of some ore deposits and from the prospect of exploiting other ore deposits, the uranium industry will be subject of an ample restructuring process. This process includes workings of modernization of the mines in operation and of the processing plant, increasing the profitableness, lowering of the production costs by closing out and ecological rehabilitation of some areas affected by mining works and even new openings of some uraniferous exploitations. This paper presents the actual situation and the prospects of uranium mining industry on the base of some new technical and economical strategic concepts in accordance with the actual Romanian Program for Nuclear Energetics.
机译:铀勘探在罗马尼亚在大约50年前开始,罗马尼亚与前苏联之间的双边协议已经结束,并创建了罗马尼亚苏联联合企业。该生产于1952年开始,通过西甲丙基凡尼亚(Bihor和Ciudanovita)的一些矿床开展。从1962年开始,该生产仅延续了罗马尼亚人参与矿床Avram Lancu和1985年,从东喀尔巴阡山脉(Crucea和Botusana)的存款。从1978年开始,从Feldioara,Brasov的铀矿石加工厂完全加工了提取的矿石。符合20世纪80年代初推出的核国家方案的初步规定,Cernavoda的核电站建设始于罗马尼亚,采用天然铀和重水(Candu型),安装了五个单位的650 MW容量。 1989年之后,修订了初始核国家计划,并于1996年进行了第一个单位(1号)的建设(1号),并于1996年进行运营。2001年,单位编号2的作品被恢复,将2005年作为预定的激活日期为本。另外3个单位的未来尚未明确决定。考虑到一些矿石沉积物的疲惫程度以及利用其他矿床的前景,铀工业将受到充分的重组过程的影响。该过程包括运营和加工厂现代化的现代化的运作,增加利润率,通过缩小采矿作品影响的某些地区的一些地区的盈利,降低了生产成本,甚至一些铀剥削的新开放。本文介绍了铀矿业对一些新技术和经济战略概念基础的实际情况和前景,根据实际的罗马尼亚核能计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号